Similar Projects
Taco Bell
New Construction - 2,053 SF
Design
$500,000 to $1,000,000 CJ est. value
Overland Park, KS 66204

Atwoods Ranch & Home
Renovation - 68,549 SF
Design
Salina, KS 67401

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

Coffeyville Field Kindley High School and Roosevelt Middle School, Renovation and Addition
Renovation, Addition
Post-Bid
Coffeyville, KS 67337

Boring Marsh of The Swans Water Supply Line
Term Contract
Post-Bid
Melvern, KS 66510

Wyandotte County Water Line - Phase V
Results
$475,000 to $650,000 est. value
Kansas City, KS

2020 Water System Improvements - 340Th Street from Thrasher Road to Tumbleweed Road
Results
KS

Topeka Zoo Giraffe Enclosure
Addition - 14,000 SF
Construction
$8,000,000 est. value
Topeka, KS 66606

Charlie's Car Wash
New Construction
Pending Verification
Lenexa, KS 66219

Coca Cola Trailer Parking
New Construction
Pending Verification
Lenexa, KS

Planeview Water Main Replacement with Customer Service Line Replacement Planeview Subdivision No.1
Infrastructure
Post-Bid
Wichita, KS

Water System Improvements
Results
Cambridge, KS

Stonebridge Crossing
New Construction - 123,471 SF
Pending Verification
$10,000,000 CJ est. value
Olathe, KS 66062

Waterline Improvements Project SRF Area D and C
Infrastructure
Post-Bid
Gardner, KS

Last Updated 11/10/2021 01:46 PM
Project Title

Pump Station 4 Force Main Realignment

Physical Address View project details and contacts
City, State (County) Kansas City, KS   (Wyandotte County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project connects to the existing 16-inch force main and realigns the force main along Highway K-32 (Kansas Avenue) and S 26th Street to a new fiberglass manhole that will connect to the existing sewer to UGWC collection system. The new force main will be PVC and an air release valve will be installed near the connection to the existing force main. The existing sanitary manholes and piping are to be abandoned in place per details in the Contract Drawings.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents