Reiman Road over Cedar Creek - Replacement - Ottawa County
Demolition, New Construction, Infrastructure
Conception
$500,000 CJ est. value
Millbury, OH 43447

O'Reilly Auto Parts (RFD) / Rossford
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Rossford, OH 43460

Roche De Boeuf Interurban - Bridge Inspection
Infrastructure, Renovation
Design
$2,450,000 CJ est. value
Bowling Green, OH 43402

New High School - Bowling Green City Schools
New Construction, Infrastructure
Design
$8,000,000 CJ est. value
Bowling Green, OH 43402

Four Lane Resurfacing - IR 75
Infrastructure
Bidding
$5,531,450 CJ est. value
Bowling Green, OH 43402

Four Lane Resurfacing - IR 75
Infrastructure
Bidding
$5,531,450 CJ est. value
Bowling Green, OH 43402

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Northwestern Water and Sewer District Oregon Road Altitude Valve Improvements
Infrastructure
Results
Bowling Green, OH

Walbridge Main Street Waterline Improvements
Infrastructure
Results
$604,000 est. value
Walbridge, OH 43465

JC Reuthinger Memorial Preserve Expansion and Addition - Wood County
Addition, Infrastructure
Pending Verification
$130,000 CJ est. value
Perrysburg, OH 43551

Perrysburg Township Administration Building
New Construction, Renovation, Infrastructure - 8,031 SF
Pending Verification
$2,000,000 CJ est. value
Perrysburg, OH 43551

Intersection Improvement (Safety)
Infrastructure
Conception
$290,000 CJ est. value
Walbridge, OH 43465

Chip and Seal of Several Roads
Infrastructure
Bidding
$300,000 CJ est. value
Bowling Green, OH 43402

Construction of the Bierley Avenue and Water Street South End Loop Waterline Improvements
Infrastructure
Post-Bid
$490,280 est. value
Pemberville, OH 43450

Last Updated 06/22/2023 09:32 AM
Project Title

Northwestern Water & Sewer District Bergin Street & Elm Tree Road Water Main Replacement

Physical Address View project details and contacts
City, State (County) Bowling Green, OH 43402   (Wood County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected December 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,234,800 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of June 22, 2023, bids rejected. No definite date for the rebid.** In general, the work consists of the replacement of approximately 1,425 feet of existing 8-inch water main with new 8-inch along East Elm Tree Road and approximately 1,100 feet of existing 8-inch water main with new 8-inch along Bergin Street. The work will also include the construction of a new manhole at the connection of the 8-inch sewer from the south to the 18-inch sewer running east and west near the bridge south of Elm Tree Road along Glenwood. The water main replacement work shall also include new fire hydrants, valves and water services including water meters and pits, and restoration of disturbed areas. Existing services are believed to include some lead water services. Technical questions regarding the project should be e-mailed to the Project Manager Theodore Bennett, P.E. at tbennett@jheng.com at Jones & Henry Engineers, Ltd. All questions shall be submitted by e-mail to Theodore Bennett, P.E. at Jones & Henry Engineers, Ltd. at 3103 Executive Parkway, Suite 300, Toledo, OH 43606, tbennett@jheng.com, no later than May 12, 2023. The Engineer's Opinion of Probable Construction Costs is $1,234,800.00.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents