Similar Projects
Goraleigh Chiller
Bidding
Raleigh, NC

Security, Lighting, and HVAC Controls
Post-Bid
Raleigh, NC

Cooling Tower Replacement
Post-Bid
Raleigh, NC 27610

Chiller and Air Handler
Results
Less than $33,739 est. value
Raleigh, NC

Bard Wall Mount Heat Pump - 3.5 Ton
Results
Less than $55,860 est. value
NC

Air Conditioning Equipment
Post-Bid
Raleigh, NC 27603

Bard Wall Mount Heat Pump - 3 Ton
Results
Less than $33,190 est. value
Raleigh, NC

Heating and Air Equipment
Post-Bid
Raleigh, NC 27603

Chiller Replacement - Lee Hall
Results
Less than $600,000 est. value
Raleigh, NC

Pullen Aquatic Center HVAC Improvements
Post-Bid
Raleigh, NC 27606

Replace Chilled Water Coils
Results
Less than $130,347 est. value
Raleigh, NC 27601

DPS - Morrison Aggrey Dorm Heating System Replacement
Post-Bid
Raleigh, NC 27699

HVAC Equipment at North Carolina State Lab of Public Health
Term Contract
Results
Less than $15,986 est. value
Raleigh, NC 27607

Century Station Air Cooled Chiller Replacement
Post-Bid
$25,000 to $100,000 est. value
Raleigh, NC 27601

Fuquay Varina Middle School Chiller Replacement
Results
Fuquay-Varina, NC 27526

Last Updated 07/16/2020 09:26 AM
Project Title

HVAC Equipment Cleaning

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27610   (Wake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

HVAC Equipment Cleaning - Contractor must carry appropriate licenses and/or certifications. Scope of work includes scheduled coil cleaning of all air cooled chillers and all cooling towers. Contractor must adhere to industry safety standards for handling and disposal of chemicals, containers, etc. and provide MSDS sheets for all chemicals used in coil cleaning process. Chemicals used must also adhere to manufacturer's maintenance guidelines. Air Cooled Chillers - Remove any debris directly around unit that could hinder unit performance. Clean all coils on unit. Process may require removing fan blades, fan motors, etc. to access discharge side of coils to remove debris, apply coil cleaner, and thoroughly rinse coils. Rinsing of coils should be performed from top of unit to bottom of unit and includes rinsing off chiller concrete pad. Rinsing process for unit, coils and concrete pad must utilize a commercial grade pressure washer. Report any noted deficiencies or recommendations to WCPSS. Cooling Towers - Remove any debris directly around unit that could hinder unit performance. Thoroughly clean cooling towers to include Hot Water Distribution Basin, Fill Material, and Cold Water Basin. Thoroughly clean metering nozzles if utilized by tower design. Cleaning should include rinsing of Tower exterior surfaces and Support Structure. Commercial grade pressure washer should be utilized in this cleaning process. Procedure includes lubrication of fan bearings and motor bearings, inspection of drive belts and make-up water float and valve assembly. Procedure includes refilling tower with fresh water and preparing unit for operation. Report any noted deficiencies or recommendations to the HVAC Assistant Supervisor. Air Handling Unit - Remove any debris directly around unit that could hinder unit performance. Clean all coils on unit including cooling coil, reheat coil, preheat coil (if equipped), and condensate drain pans. This equipment will be scheduled on an as-needed basis rather than on a preventative maintenance schedule.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents