Similar Projects
Murphy Creek Lift Station Wetwell Recoating
Post-Bid
Aurora, CO

Milavec West Pump Station Screen and Filter Improvements
Post-Bid
Frederick, CO 80530

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Mead Middle School Vertical Turbine Pump Station
Results
Mead, CO 80542

Quail Dunes Golf Course Pump Station Replacement
New Construction, Infrastructure
Post-Bid
Fort Morgan, CO

Nine-Mile Driver Relief Station Replacement
Results
Denver, CO

Dowd Junction Lift Station 4 and Force Main Replacement
New Construction, Alteration
Post-Bid
Eagle, CO

CTF TCF Water Pump Skid Repl. Dq1 GC CMS165046
Results
Less than $60,000 est. value

Firestone Horizontal Well (FAST) Pump Station Project
New Construction
Post-Bid
Longmont, CO 80504

Frisco Bay Marina Sewage Lift Station and Deep Utilities
Results
Breckenridge, Frisco, CO 80424

Construction Manager for Potable Water Pump Station Construction
Renovation
Post-Bid
Colorado Springs, CO

CTF ECCPC South Pump Station Roof DQ1 GC CMS164761
Renovation
Results
$150,000 est. value
Gunnison, CO 81230

Rolling Hills Booster Pump Station
Renovation
Post-Bid
$2,500,000 est. value
Colorado Springs, CO

Roaring Fork Pump Station
New Construction
Results
Glenwood Springs, CO

63rd WTF Campus Electrical and High Service Pump Station Improvements
Alteration
Post-Bid
Boulder, CO

Last Updated 04/28/2022 09:56 AM
Project Title

Gold Creek Lift Station Project

Physical Address View project details and contacts
City, State (County) Elizabeth, CO   (Elbert County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work for which the Bid is requested includes, but is not necessarily limited to, the furnishing of labor, materials and equipment for the installation of a new lift station, consisting of the following key components: 1. New precast concrete manhole. 2. Two (2) submersible pumps. 3. New meter vault and magnetic flow meter. 4. New manhole upstream of lift station, with sluice gates for controlling flow. 5. New Control Panel. 6. Piping to existing manhole for emergency overflow storage. 7. All associated appurtenances, electrical, instrumentation, and controls.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents