Similar Projects
Multi-Purpose Indoor Sports Venue - City of Bossier City
New Construction, Infrastructure
Conception
$25,000,000 CJ est. value
Bossier City, LA 71111

LA Highway 3 (Benton Road) @ Chinaberry (Southbound Left Turn Lane) - City of Bossier City
Infrastructure
Conception
$450,000 CJ est. value
Bossier City, LA 71111

LA 931 at Roddy Rd. and Joe Sevario Rd.
Infrastructure
Design
$2,500,000 CJ est. value
Gonzales, LA 70737

PR 929 Overlay : US 61 - LA 42
Infrastructure
Design
$2,500,000 CJ est. value
Prairieville, LA 70769

US 61: LA 74 - LA 42
Infrastructure
Bidding
$15,000,000 CJ est. value
Sorrento, LA 70778

LA 1181/1182: LA 107 - Mp Cutoff Rd
Infrastructure
Bidding
$2,500,000 CJ est. value
Plaucheville, LA 71362

Alta Road Bridge Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$696,942 CJ est. value
Bell City, LA 70630

Alta Road Bridge Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$696,942 CJ est. value
Bell City, LA 70630

South Texas Street Sewer Rehabilitation
Infrastructure
Results
$199,838 CJ est. value
Deridder, LA 70634

Bulk Fuel Storage Tank
Infrastructure
Results
$32,921 CJ est. value
Gonzales, LA 70737

Preston Crownover Artificial Turf Field
Infrastructure
Construction
$1,168,700 CJ est. value
Bossier City, LA 71112

Shell Chemical Geismar Plant Expansion
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$1,200,000,000 CJ est. value
Geismar, LA 70734

Pelican Pointe Apartments
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Benton, LA 71006

Sewer Basin BC-22 (Big Airline Area) - City of Bossier City
Infrastructure
Conception
$1,750,000 CJ est. value
Bossier City, LA 71171

Phase 2 - Parkway High School - 2012 Bond - New Field House for Girls Athletics - Bossier Parish Schools
Addition, Infrastructure
Design
$6,500,000 CJ est. value
Bossier City, LA 71112

Last Updated 10/03/2023 03:05 AM
Project Title

Catfish Point Control Structure Support Systems Installation

Physical Address View project details and contacts
City, State (County) Creole, LA 70632   (Cameron County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,738,436 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Sep 29, 2023 Contract Award Number: W912P823C0061 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: X87VQQCHNU79 Contractor Awarded Name: READY POWER LLC Contractor Awarded Address: New Orleans, LA 70125 USA Base and All Options Value (Total Contract Value): $1,738,436.20 Amendment 0002 a) The instructions are revised in the Instructions to Offerors.The vist is amended to 10:00 AM, Monday, 11 SEP 2023. b) Requests For Information questions due by noon, 12:00 PM, 13 SEP 2023. c) The PWS is Revised to include Optional Work, CLINS 0007-0016 added. d) The proposal due date is extended to 11:30 AM, 21 SEP 2023. See Continuation Sheet in the Attachment. Nothing Follows. The U.S. Army Corps of Engineers - New Orleans District is issuing a Solicitation Notice for Installation of Support Systems at Catfish Point Control Structure (CSCP). This requirement is issued as a 100% Total Small Business set-aside under request for proposal W912P823R0053. It is being procured as a firm fixed price under FAR part 12, Acquisition of Commercial Items, and FAR part 13, Simplified Acquisition Procedures. The designated NAICS code is 238210, with a small business size standard of $19.0 Million. The work consists of the installation of the support systems at the CPCS to accompany the Government installation of new sector gates and new hydraulic machinery for Gate Bay 1. Systems include the procurement and installation of the sector gate impressed current system, the electrical distribution system and its structural platforms, miscellaneous structural design elements (bolts, Hilti anchors, etc), and hydraulic commissioning of the machinery. Government furnished and installed items are the pair of sector gates, hinge and pintle components, gear rack, hydraulic drive system, and the hydraulic power unit. The contractor shall furnish all necessary labor, supervision, other items and services necessary to satisfactorily perform the installation of support services as defined in this PWS at the designated facilities within the Mississippi Valley New Orleans District (MVN) CPCS. The is located 45 miles southeast of Lake Charles, LA via LA State Highways 14, 27 and 82 to Grand Chenier. The CPCS is an additional 15 miles by water from Grand Chenier via the Mermentau River. The boat landing is located at 3620 Little Chenier Rd, Creole, LA 70632 (29.8237137 N, -92.8785611 W). Potential offerors MUST register on SAM.gov in order to receive notification(s) and/or change(s) to the solicitation. The Interested Vendors List (IVL) will be activated and may be accessed and printed from the SAM.gov web . Prospective contractors who would like their company name included on the IVL list may do so on the sam.gov website under IVL. You will need the adobe acrobat reader for .pdf files (www.adobe.com) in order to open most files posted by the New Orleans District. Offerors are also encouraged to post notices of prospective subcontracting opportunities on the Small Business Administration's Subnet, at http://web.sba.gov/subnet. Offerors must be registered with System Award Management (SAM), in order to receive a Government contract award. If an offeror is not registered with SAM, it must register online at www.sam.gov. The point of contact for this synopsis is Jason B. Meyers at jason.b.meyers@usace.army.mil. Part 1 General Information The USACE Catfish Point Control Structure (CPCS) was constructed in 1951 to provide protection against high tides and salt water intrusion. The structure consists of three 56-foot wide navigation channels, each with a pair of operable sector gates. The current sector gates and machinery are original and are approaching their project life. The site is located 45 miles southeast of Lake Charles, LA via LA State Highways 14, 27 and 82 to Grand Chenier. The CPCS is an additional 15 miles by water from Grand Chenier via the Mermentau River. The boat landing is located at 3620 Little Chenier Rd, Creole, LA 70632 (29.8237137 N, -92.8785611 W). Transportation to and from the dock and lock shall be accomplished between 7:30 AM and 4:30 PM Monday through Friday. The Government will not be responsible for any increased costs due to early or late delivery/pickup. The Contractor shall notify the Contracting Officer's Representative at least two days in advance of the scheduled work. Part 2 Objectives The base work consists of the installation of the support systems at the CPCS to accompany the Government installation of new sector gates and new hydraulic machinery for Gate Bay 1. (The installation of the same equipment and systems for Gate Bays 2 and 3 are scheduled for 2024 and thus will not be included in this contract). Systems include the procurement and installation of the sector gate impressed current system, the electrical distribution system and its structural platforms, miscellaneous structural design elements (bolts, Hilti anchors, etc), and hydraulic commissioning of the machinery. Government furnished and installed items are the pair of sector gates, hinge and pintle components, gear rack, hydraulic drive system, and the hydraulic power unit. Enclosure 1 contains reference documents for all Government furnished and installed components. Ongoing coordination with USACE field personnel is required throughout the contract . Much of the Contractor's work can not occur until the Government performs demolition and installation. The Contractor shall be responsible for obtaining the use of a staging area for his/her own use for employee vehicle parking near boat launch/docking facility. All transportation to and from the work for Contractor personnel, equipment, and materials shall be the responsibility of the Contractor. The term month within this contract refers to 28 calendar days. The term week in this contract refers to 7 calendar days. Enclosure 2 provides technical specifications for each of the supporting systems, to include cathodic protection, electrical distribution, and hydraulic commissioning. Enclosure 3 provides plans to accompany the technical specifications. These plans and specs are recommendations; the Contractor is free to utilize his own means and methods to complete the contract requirements.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents