Similar Projects
Two Year Labor Contract to Provide Laboe to Install, Uninstall and Reinstall Vehicle Tracking Equipment for Jefferson Parish
Term Contract
Sub-Bidding
Gretna, LA 70053

Two (2) Year Contract for Drainage Maintenance Construction East and West Jefferson Parish
Term Contract
Sub-Bidding
$7,500,000 CJ est. value
Gretna, LA 70053

Contract to Supply Building Materials
Term Contract
Post-Bid
Kenner, LA 70062

Elevator Maintenence
Term Contract
Post-Bid
New Orleans, LA 70119

D02 Generator Relocation: CCC to BC
Renovation
Results
$705,000 CJ est. value
New Orleans, LA 70123

Two Year Contract for Grass Cutting and Trimming of All Jefferson Parish Water Facilities
Term Contract
Sub-Bidding
Gretna, LA 70053

Pre-placed Emergency Contract for Point Repair, Lining and Emergency Restoration of Existing Sewer Mainlines and Force Mains
Term Contract
Post-Bid
$370,000 CJ est. value
Gretna, LA 70053

Purchase of Fire Fighting Hose for the East Bank Consolidated Fire Department
Term Contract
Sub-Bidding
Metairie, LA 70001

Bayo Tree Stump Removal
Term Contract
Post-Bid
Westwego, LA 70094

Hazard Mitigation Planning, Community Rating System Planning and Coastal Strategic Planning
Term Contract
Sub-Bidding
$350,000 CJ est. value
Lafitte, LA 70067

Exterior Cleaning and Pressure Washing
Term Contract
Post-Bid
New Orleans, LA

Preventative Maintenance of Existing Sanitary and Storm Sewers, Including Service Laterals
Term Contract
Post-Bid
Kenner, LA 70062

Provide Cleaning and Flushing of Subsurface Drain Lines And Drainage Structures
Term Contract
Post-Bid
Kenner, LA 70062

West Power Complex Packaged Auxiliary Electrical Equipment Procurement
Term Contract
Post-Bid
New Orleans, LA 70112

Three Year Labor Only Contract to Troubleshoot, and Repair Various Fire Alarm and Sprinkler Systems for Jefferson Parish General Services
Term Contract
Post-Bid
Gretna, LA 70053

Last Updated 08/22/2023 04:38 PM
Project Title

Two (2) Year Contract for Maintenance and Repairs of Waterworks Waukesha Diesel Engines and Repairs to Generator

Physical Address View project details and contacts
City, State (County) Marrero, LA 70072   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Two (2) year contract for preventative maintenance and repairs of Waterworks Waukesha Diesel Engines and repairs to related generators for Department of Public Works (Water) Surety Bid Bond-An Electronic bid bond for 5%of the total bid is required with submission Performance Bond is required for 50% of the contract price. This is due at the signing of the formal contract. Payment Bond is required for 50% of the contract price. These are due at the signing of the formal contract. JEFFERSON PARISH reserves the right to cancel all or any part if not shipped promptly. No charges will be allowed for parking or cartage unless specified in quotation. The order must not be filled at a higher price than quoted. JEFFERSON PARISH reserves the right to cancel any contract at anytime and for any reason by issuing a THIRTY (30) day written notice to the contractor.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents