Similar Projects
Utility Improvements - Ruth Avenue, Hickory Street, and Jefferson Street Project
Infrastructure
Bidding
$250,000 est. value
Sandpoint, ID 83809

Utility Improvements - Ruth Avenue Hickory Street Jefferson Street
Alteration
Bidding
$150,000 to $300,000 est. value
Sandpoint, ID

Replacement of Irrigation Control System
Infrastructure
Post-Bid
$346,100 est. value
Twin Falls, ID 83301

Main Street Sidewalk ADA Ramps
Alteration
Post-Bid
Lapwai, ID

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

Idaho Community Development Block Grant
New Construction, Infrastructure
Results
$175,174 est. value
Moscow, ID 83843

Replacement of Concrete
Infrastructure
Bidding
Harrison, ID

MCOP Water Meter Purchase
Infrastructure
Post-Bid
Coeur d'Alene, ID

Acoustic Mitigation Isolation, Phase 1
Renovation, Alteration
Results
$2,400,000 est. value
Moscow, ID

Sixth Street Crossing Over Paradise Creek
New Construction, Infrastructure
Bidding
$1,000,000 to $1,300,000 est. value
Moscow, ID

Pipe
Alteration
Post-Bid
Idaho Falls, ID

Construction of Approximately 1100 feet of 8-inch Potable Water Line
Infrastructure
Results
$235,000 est. value
Nampa, ID 83687

Creason Pathway Construction
Infrastructure
Bidding
Meridian, ID

Parking Lot and Utilities Demolition
Infrastructure
Post-Bid
Coeur d'Alene, ID 83814

Pedestrian Path Connection Plan
Infrastructure
Results
$250,000 to $500,000 est. value
ID

Reported 03/11/2022 12:00 AM
Project Title

2022 Waterline Surface Repair

Physical Address View project details and contacts
City, State (County) Idaho Falls, ID   (Bonneville County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of furnishing all labor, materials, and equipment necessary to satisfactorily install plant mix, curb & gutter, rebar, sidewalk, driveway/approach or related flat work

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents