Similar Projects
Bremerton Station
Renovation, Infrastructure
Conception
Bremerton, WA 98310

Bremerton Station
Renovation, Infrastructure
Conception
Bremerton, WA 98310

2022 Annual Roads Program
Infrastructure
Bidding
$575,000 to $650,000 est. value
Bainbridge Island, WA

Burley Glenwood Elementary School - ADA Site Improvements
Infrastructure
Bidding
$500,000 to $600,000 est. value
Port Orchard, WA 98367

2022 Preservation Project - Glenwood Rd & Holly Road
Infrastructure
Post-Bid
$900,000 to $1,250,000 est. value
WA

Sportsman Club and New Brooklyn Road Intersection Improvements
Infrastructure
Post-Bid
$920,000 est. value
Bainbridge Island, WA 98110

Ostrich Bay Creek Stormwater Treatment
Infrastructure, Alteration
Results
$1,000,000 to $1,300,000 est. value
Bremerton, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Construction Management Services
Alteration
Bidding
Bremerton, WA

2022 Western Region Pavement Preservation MATOC
Alteration
Post-Bid
$300,000 to $10,000,000 est. value

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Preservation Glenwood Road and Holly Road
Infrastructure
Results
$900,000 to $1,250,000 est. value
WA

Ls Resurfacing 1
Term Contract
Post-Bid
$997,219,550 est. value

SR 305, Murden Creek - Remove Fish Barrier
New Construction, Infrastructure
Results
$5,000,000 to $7,500,000 est. value
WA

Reported 04/28/2022 12:00 AM
Project Title

Systemic Safety Improvements

Physical Address View project details and contacts
City, State (County) Poulsbo, WA   (Kitsap County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $180,000 to $210,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of work to be performed within 50 working days from Notice to Proceed and consists of furnishing all materials, equipment, tools, labor, and other work or items incidental theretofore and as generally described as follows: The project will construct intersection and mid-block improvements including curb ramps, crosswalks, re-striping, and other safety improvements at six locations. The primary improvements at each location are as follows: oSite 1: Viking Avenue NW/NW Edvard Street-striping improvements oSite 2: NW Lindvig Way/ Fish Park Entrance ---curb ramp replacements at all four corners and striping improvements oSite 3: NE Hostmark Street/ Caldart Avenue NE - curb ramp replacement on the northeast corner and associated re-striping oSite 4: Caldart Avenue NE/NE Mesford Street-roadway removal and replacement oSite 5: Front Street -- install, raised concrete mid-block crosswalk and storm drain improvements oSite 6: Noll Road NE/NE Sunnymeade St - remove crosswalk and restoration.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents