Similar Projects
New Ball Field at Eric W. Auer Killingworth Recreational Park - Town of Killingworth
Infrastructure
Conception
$500,000 CJ est. value
Killingworth, CT 06419

Tennis Court - Watrous Park - Town Of Cromwell
Infrastructure
Conception
$900,000 CJ est. value
Cromwell, CT 06416

Wesleyan Neighborhood Preschool
New Construction, Infrastructure - 7,000 SF
Design
$1,000,000 CJ est. value
Middletown, CT 06457

RFQ Design - Architect/Engineer (A/E) Consultants (Study) - WFH: Planning Study- New Building
New Construction, Infrastructure
Bidding
$5,470,000 CJ est. value
Middletown, CT 06457

Gildersleeve Drive Site Improvements
Infrastructure
Post-Bid
East Hampton, CT 06424

Veterans Memorial Park and Pool Improvements
Infrastructure, Renovation
Post-Bid
$3,000,000 CJ est. value
Middletown, CT 06457

Primary Tunnel Repairs Project
Results
Cromwell, CT

Replacement of Main Street Retaining Wall Modular Block Retaining Wall
Infrastructure
Results
Cromwell, CT

Nod Road Self Storage
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Clinton, CT 06413

Butternut Street Multifamily
Infrastructure
Post-Bid
Middletown, CT 06457

Summit Thread Site Redevelopment
Infrastructure
Results
East Hampton, CT 06424

Installation, Relocating and Removal of Benthic Barriers at Cedar Lake
Infrastructure
Post-Bid
$400,000 est. value
Chester, CT

Thatchbed Island Protection and Restoration Program
Infrastructure
Results
Essex, CT 06426

8 Unit Expansion for: Middletown Housing Authority Marino Manor
New Construction, Infrastructure
Post-Bid
$7,000,000 CJ est. value
Middletown, CT 06457

Runway 6/15 - Off Airport Obstruction Removal Bradley International Airport
Infrastructure
Results
$1,891,750 CJ est. value
Windsor Locks, CT 06096

Last Updated 08/09/2022 05:33 PM
Project Title

Shadow Lane Dam And Culvert Replacement - Town Of Cromwell

Physical Address View project details and contacts
City, State (County) Cromwell, CT 06416   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of undersized Cross Culvert & address damage to dam spillway. As of August 9, 2022, this project is included in the Town of Cromwell's FY 2022 - 2023 CIP and funding is allocated for FY 2023-2024. Information regarding design team and contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents