Similar Projects
CDBG Group 2 - Reconstruction East 7th Street (Iowa to LeClaire) and LeClaire Street (6th-8th)
Infrastructure
Bidding
Davenport, IA 52803

Eastern Avenue Resurfacing - 43rd to 46th
Infrastructure
Bidding
Davenport, IA 52805

Wisconsin & 35th Street Improvements – HMA Surfacing And Trail
Infrastructure
Post-Bid
Le Claire, IA

CDBG Replenishment - Group 1 (Hoover, Appomattox Road and North Ripley Street)
Infrastructure
Post-Bid
Davenport, IA 52806

Indiana Avenue Friction Seal
Infrastructure
Results
Bettendorf, IA

23rd Street Reconstruction Project - Grant Street to State Street
Infrastructure
Results
Bettendorf, IA

Archer Court Resurfacing (Waverly to Cul-de-Sac)
Infrastructure
Bidding
Davenport, IA

Marquette and West 12th Street Replacement
Infrastructure
Results
Davenport, IA

Middle Road Rehabilitation Project - Crow Creek Road to 53rd Avenue
Infrastructure
Results
Bettendorf, IA

Emerald Drive Reconstruction
Infrastructure
Results
Davenport, IA 52804

2021 Alley Resurfacing Program
Infrastructure
Results
Davenport, IA

Hickory Grove Road Resurfacing, North Pine Street North to end of HMA overlay
Infrastructure
Results
Davenport, IA 52805

Johnson Avenue Reconstruction (Fairmount to Gayman)
Infrastructure
Results
Davenport, IA 52802

Sewer Lateral Program FY22
Infrastructure
Results
Davenport, IA

2021 Rural Road Sealcoat Program
Infrastructure
Results
Bettendorf, IA

Last Updated 07/03/2021 01:22 AM
Project Title

2021 Alley Rehabilitation Program

Physical Address View project details and contacts
City, State (County) Bettendorf, IA   (Scott County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed improvements consist of rehabilitating six (6) alleys with an approximate length of 365 feet, 220 feet, 223 feet, 830 feet, 374 feet, and 367 feet respectively. The alley locations are: alley west of 8th Street between Brown Street and Grant Street, alley south of Mississippi Boulevard between 19th Street and 20th Street, alley south of Mississippi Boulevard between 20th Street and 21st Street, alley south of Central Avenue between 21st Street and 23rd Street, alley north of Central Avenue between 25th Street and 26th Street, and the alley from Glencoe Lane to 28th Street between Glenn Street and Cody Street. The proposed improvements consist of milling the existing surface and subbase placement of granular subbase and resurfacing with Hot Mix Asphalt (HMA). The program also includes partial construction of driveways, sodding, and other work related to reconstruct the alley.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents