Similar Projects
Z--Replace Ceiling Tiles and Paint Stairwells
Term Contract
Design
$25,000 to $100,000 est. value
San Francisco, CA

Install drapery system
Alteration
Bidding
$1,130,000 est. value
CA

Fabricated Mast Assembly 9 Ft and Equipment Enclosure
Term Contract
Bidding
Menlo Park, CA

Storefront Aluminum Wall Panel Material and Installation Services
Alteration
Post-Bid
Byron, CA 94514

Z2--Removal/Installation of Theater Acoustic Fabric
Term Contract
Post-Bid
Petaluma, CA 94952

Construction Services for the EIBJCWTP Fall Protection Improvements
Alteration
Results
American Canyon, Napa, CA 94503

Painting of Interior Vehicle Shop
Alteration
Results
Long Beach, CA 90806

Demuth Community Center Egress And Gym Improvements
Renovation, Alteration
Post-Bid
$750,000 to $950,000 est. value
Palm Springs, CA 92264

Santa Clara Convention Center Wall Coverings Project
Alteration
Results
Santa Clara, CA 95050

Storm Water Pump Station Roof and Facilities Improvements
Alteration
Post-Bid
$575,000 est. value
Huntington Beach, CA 92648

CA State Railroad Museum Screen Wall
Alteration
Results
$50,000 to $150,000 est. value
Sacramento, CA 95814

Orchard Dale Elementary School Modernization Project- Plaster/Drywall
Alteration
Results
Whittier, CA 90603

Installation of Vinyl Covered Tackboard at Various Sites
Alteration
Results
$22,796 est. value
Tulare, CA

Interior Painting, Installation of Protective Wall Covering, and Replacement of Rubber Cove Base
Term Contract, Alteration
Results
$20,000 est. value
Indio, CA 92202

Interior Painting Services, Installation of Protective Wall Covering, and Replacement of Rubber Cove Base
Alteration
Results
$45,000 est. value
Riverside, CA 92506

Reported 12/30/2021 12:00 AM
Project Title

PKC - 22 AS Blinds

Physical Address View project details and contacts
City, State (County) Fairfield, CA 94534   (Solano County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

22 AS Rolling Shades: contractor must measure prior to installation and shall provide all tools, materials and labor needed to deliver and install shades: - remove and dispose of existing blinds

Details

Division 09 - Finishes.
Division 12 - Furnishings, Window Blinds.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents