Similar Projects
Fire Suppression System Monitoring & Maintenance, Phoenix Az
Design
Phoenix, AZ

J059--Multi Site Generator Maintenace
Term Contract
Bidding
Phoenix, Prescott, Tucson, AZ 86313

H112--644 Fire Extinguisher Inspection & Maintenance
Term Contract
Bidding
Phoenix, Prescott, AZ - Loma Linda, CA - Albuquerque, NM 85012

Invest In Us - An Energy Efficient Upgrade Project
Post-Bid
$450,000 to $500,000 est. value
Phoenix, AZ 85015

Electric Meter Testing, Calibration and Repair Services
Term Contract
Post-Bid
Phoenix, AZ

Industrial, Building, Plumbing, Electrical, and HVAC Materials
Results
Phoenix, AZ

Streetlight Pole Replacement
Results
Chandler, AZ

Fire Alarm System Remove and Replace
Post-Bid
Fountain Hills, AZ 85268

Aircraft Ground Power Units and Pre-Conditioned Air Units
Results
Mesa, AZ

Generators, Accessories, Maintenance and Repair Services
Post-Bid
Phoenix, AZ 85009

D--SCADA EMS Grid Control Across WAPA Regions
Results
Phoenix, AZ 85009

Electrical and Flooring Supply and Installation
Post-Bid
Glendale, AZ 85051

Park Light Pole Installation
Results
Tempe, AZ 85280

Emergency Generator Rental Services
Term Contract
Post-Bid
Mesa, AZ 85211

Job Order Contract Electrical Services
Term Contract
Results
Mesa, AZ 85211

Reported 08/14/2021 12:00 AM
Project Title

PIMC Kitchen Hood Service

Physical Address View project details and contacts
City, State (County) Phoenix, AZ   (Maricopa County)
Category(s) Single Trades
Sub-Category(s) Electric, Fire Protection
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Phoenix Indian Medical Center had an inspection of the kitchen area, specifically the fire suppression system in the kitchen. The fire suppression systems in the basement and 5th floor kitchen need to be updated and/or added to bring the system up to the current NFPA 96. Please note, the electrical breakers for the kitchen are Federal Pacific, so allowances need to be made for controls because of the age and type of breakers involved. The objective of this contract is to correct deficiencies to make the kitchen safe for the dietary staff, patients, staff and the building structure, thus meeting current code for commercial kitchen. Other inspections by consultants concerned with Joint Commission compliance have made observations known, see appendix A, pictures.This will improve the functioning of the fire suppression system and all related parts in the kitchen for the basement as well as the kitchen on the 5th floor.

Details

Division 21 - Fire Suppression.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents