Similar Projects
Long Savannah - Master Plan
New Construction
Design
Charleston, SC

Construction Management at-Risk Services for Clemson Police Station
Renovation - 8,000 SF
Post-Bid
Less than $3,000,000 est. value
Clemson, SC 29631

Structural Retrofit for CFD Fire Station 06 Cannon Street
Post-Bid
$4,250,000 to $5,000,000 est. value
Charleston, SC 29403

Darlington Fire District Dovesville
Term Contract
Results
Darlington, SC 29540

Beaufort County Bluffton Fire District Station 32 Renovation and Additions Construction Project
Renovation, Addition
Results
Bluffton, SC 29909

Cane Bay Fire Station
New Construction - 8,000 SF
Construction
Moncks Corner, SC 29430

Charleston Police Department Forensic Services Building
New Construction - 21,500 SF
Construction
Less than $9,385,006 est. value
Charleston, SC 29414

Alterations and Additions to Police Annex Training Center
Renovation, Addition
Post-Bid
Less than $3,700,000 est. value
Myrtle Beach, SC 29578

Simpsonville Fire Station Project (Station 6)
New Construction
Results
Simpsonville, SC 29681

Awendaw Fire Station 7 New Construction
New Construction
Construction
Awendaw, SC 29429

Rehab Building for Police Department and Courtroom-Offices
Renovation
Post-Bid
Less than $300,000 est. value
Saint George, SC 29477

CM at-Risk Services for a New Courthouse and Other Projects
New Construction
Results
Spartanburg, SC

JIPSD Fire Station 1
New Construction - 12,400 SF
Construction
Charleston, SC 29412

Renovations and Repairs to City Hall Fire Inspections
Renovation
Post-Bid
North Charleston, SC 29419

Fire Station 1 Remodel Project
Renovation
Results
Myrtle Beach, SC

Last Updated 10/08/2020 12:22 PM
Project Title

Design/Build Proposal for Metal Building Addition and Improvements to the Existing Medic 30 EMS Station-2814

Physical Address View project details and contacts
City, State (County) Greenwood, SC 29646   (Greenwood County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New single story, two-bay metal building located at the rear of the existing station connected to Hwy 25 S with a concrete driveway. The renovation portion of the project will consist of 1.) upgrading the existing bathroom to meet ADA standards, 2.) upgrades to the existing kitchen and 3.) upgrades and repairs to the existing garage.

Details

1 Story Above Grade, 1,600 SF Addition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Interior Lighting, Emergency Lighting.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents