Similar Projects
Bus Stop Construction And Installations - Phase 1
New Construction
Results
Greenville, SC

Design-Bid-Build Services - Electric Bus Charging Infrastructure
New Construction
Post-Bid
SC 29405

Materials, Asphalt Paving And Tie Disposal As Part Of The 2020 Short Line Improvement Program
Renovation, Infrastructure
Post-Bid
Rock Hill, SC

Rental Car Canopies (Construction) at Myrtle Beach International Airport (MYR)
Alteration
Results
Myrtle Beach, SC 29577

Southern Carolina Landing Pad
Post-Bid
Beaufort, SC 29901

Gateway Enhancement
Renovation
Results
SC

Bus Stop Shelters and Other Amenities
Results
Greenville, SC 29602

Installation of Bus Stop Signs and 1 Bus Shelter
Alteration
Results
$40,000 to $50,000 est. value
Elgin, Kershaw, SC

Installation of Bus Stop Signs and 1 Bus Shelter
Alteration
Results
$40,000 to $50,000 est. value
Elgin, Kershaw, SC

Installation of Bus Stop Signs and 1 Bus Shelter
Alteration
Results
$40,000 to $50,000 est. value
Elgin, Kershaw, SC

Design Assist Subcontractor Services for Gateway Enhancement
New Construction
Results
North Charleston, SC 29418

Reported 02/23/2022 02:38 PM
Project Title

Y--Design-Build (DB), P-1254 Mobile Aviation Maintenance Facility Power Upgrades, MCAS Beaufort, SC

Physical Address View project details and contacts
City, State (County) Beaufort, SC   (Beaufort County)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will provide the station with the ability to island the mobile maintenance facility using ground-mounted solar photovoltaic system, natural gas generator, battery storage, and a micro-grid controller at Marine Corps Air Station Beaufort, North Carolina. This project includes the design and construction of 2MW of ground-mounted solar photovoltaic systems, 1000kW/4MWH minimum battery storage systems, natural gas backup generation, switching and transfer ability and minor lighting upgrades. The project will provide a 2 MW ground-mounted solar photovoltaic system, plus 1 MW/4MWh minimum of battery storage and standby backup generation to ensure uninterrupted power for the mobile aviation maintenance facility Bldg. 1254 (a.k.a. "van pad"). Ancillary equipment will include power conditioning and control equipment to allow the van pad to operate in island mode. Minor lighting upgrades will also be made at the site to improve lighting quality and reduce energy consumption. The project will enable the facility to continue operations and keep aircraft mission-ready through prolonged disruptions in the commercial grid. Project benefits include: Energy resilience by allowing the Station to island the mission-critical aviation support facility. Cost avoidance by reducing lost productive labor hours associated with downtime caused by power outages at the van pad. Increase in aviation readiness by enabling 24/7 operations and reducing turnaround time for critical avionics and airframe maintenance, testing, calibration and repairs. Energy cost reduction via onsite generation and battery storage. Generation assets that can be leveraged to help black start the installation when the FY2019 ERCIP project P-505 is constructed.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents