Similar Projects
North Choctaw Road, East 66 Highway - 1100 Feet north of the intersection of N Choctaw Road and East 66 Highway (Ward 7) - City of Oklahoma City
New Construction, Demolition, Infrastructure
Conception
$415,000 est. value
Oklahoma City, OK 73054

Bike Lanes: Along the N. Villa AveNue., N. Youngs Boulevar., and N. Venice Blvd. alignments between NW 62nd St. and NW 10th St.
Infrastructure
Conception
$922,000 est. value
Oklahoma City, OK

USACE, Tulsa District WOSB MATOC
New Construction
Design
Less than $49,500,000 est. value

IDIQ Express Menu Small Project Construction Services - Western Oklahoma
New Construction
Design

Air Force Life Cycle Management Center WAG B9201 Project, Tinker AFB
New Construction, Infrastructure - 35,000 SF
Bidding
$25,000,000 CJ est. value
Oklahoma City, OK 73145

Air Force Life Cycle Management Center WAG B9201 Project, Tinker AFB
New Construction, Infrastructure - 35,000 SF
Bidding
$25,000,000 CJ est. value
Oklahoma City, OK 73145

Canal Lighting Improvements Phase 2
Infrastructure
Sub-Bidding
$295,000 CJ est. value
Oklahoma City, OK 73102

JFHQ Civil Improvements - Phase 0 - Bid Package #1
Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
Oklahoma City, OK 73111

OMD JFHQ Civil Support Team Remodel Phase 1
Renovation
Post-Bid
Oklahoma City, OK 73111

Civil Site Improvements
Infrastructure
Post-Bid
Oklahoma City, OK 73109

Building 118 Remodel
Renovation
Results
$397,418 est. value
Oklahoma City, OK

Drill, Case and Complete Water Well | Lots 1,2,3,4 and S/2N/2 Sec 1-4N-13ECM
Infrastructure
Results
Oklahoma City, OK

New Saigon Apartments
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Oklahoma City, OK 73106

Deep Fork Greenway Trail - Northeast Oklahoma City (Ward 7)
Infrastructure
Conception
Oklahoma City, OK

Interchange - US 40
Infrastructure
Design
$43,000,000 est. value
Oklahoma City, OK 73195

Last Updated 07/27/2022 02:05 AM
Project Title

DLA Office and Breakroom Tinker AFB

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73145   (Oklahoma County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Military Facility, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT LOCATION Project area is located on the north end of B416, throughout B506, and on the southwest corner of B3001. DLA Office and Breakroom TINKER AFB, OK This acquisition is 100% small business set-aside. The NAICS Code for this project is 236220. In accordance w ith FAR 36.204, the magnitude of this construction is Betw een $500,000 and $1,000,000. The Request for Proposal is due on 20 Jun 2022 at 2:00 PM CST. This project is for the renovation of B416, B506, and B3001 DLA facilities at Tinker AFB, Oklahoma City, OK. The project entails furnishing all Design/Engineering Services, materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to renovate the northside breakroom within B416 and adjacent vestibule. Options include carpet replacement within B506 as well as the demolition and construction of a new breakroom within B3001. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS Copies of the solicitation and any amendments will be provided electronically to the contractor through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/. Electronic copies of each volume shall be submitted through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/. Proposals submitted by mail or hand carried will not be evaluated. Proposals sent through proprietary or third-party File Transfer Protocol (FTP) sites or DoD SAFE will not be retrieved. It is the responsibility of the Offeror to confirm receipt of proposals. All proposals received after the exact time specified for receipt shall be treated as late submissions and will not be considered except under facts and circumstances allowed by the Federal Acquisition Regulation (FAR). There are 10 general steps a vendor must follow in order to use PIEE application modules. A complete list can be viewed at the following site: https://piee.eb.mil/xhtml/unauth/web/homepage/vendorGettingStartedHelp.xhtml#step5 For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. It is the Offeror's responsibility to obtain written confirmation of receipt of all electronic files of the full proposal by the Tulsa District Contracting office. In the event the Solicitation Module is down, the alternate method for proposal submission is via email to: Terry.L.Hawkins@usace.army.mil and rudolfo.morales@usace.army.mil ONLY. The Offeror must obtain prior approval from the Contracting Officer to use the alternate submission method. Offerors are responsible for ensuring electronic copies are virus-free and shall run an anti-virus scan before submission. Electronic copies of each volume shall be compatible with the following software products: Adobe Acrobat Reader 11 and Microsoft Office Suite 2016. Narrative portions of the proposal shall be in Adobe Acrobat portable document file (pdf) searchable text format. The Offeror shall not embed sound or video (e.g., MPEG) files into the proposal files. Electronic files shall be clearly identified for each volume, section, and item. 1.4. OFFEROR'S QUESTIONS AND COMMENTS All contractual matters, questions and or comments relative to these documents should be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org no later than 5 calendar days prior to the proposal due date, in order that they may be given consideration or actions taken prior to receipt of offers. The Bidders Inquiry Key for this project is: TBD Instructions for registering in the ProjNet Bidder Inquiry system are available on the above web site *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents