Similar Projects
SR 20/Eagle Vista Dr to Ault Field Rd Vic - ADA Compliance
Infrastructure
Design
$668,000 CJ est. value
Oak Harbor, WA 98277

SR 20/Eagle Vista Dr to Ault Field Rd Vic - ADA Compliance
Infrastructure
Design
$668,000 CJ est. value
Oak Harbor, WA 98277

Expansion and Upgrading of the Existing Electrical Substation
Infrastructure
Bidding
$340,000 CJ est. value
Camano Island, WA 98282

Expansion and Upgrading of the Existing Electrical Substation
Infrastructure
Bidding
$340,000 CJ est. value
Camano Island, WA 98282

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Ls Resurfacing 1
Term Contract
Results
$997,219,550 est. value

SR 20/Boon Rd Vic to Eagle Vista Dr Vic - Paving
Infrastructure
Design
$1,241,000 CJ est. value
Coupeville, WA 98239

Bonnie View Acres Road South Outfall
Infrastructure
Bidding
$155,000 CJ est. value
Oak Harbor, WA 98277

Hoypus Point Restoration
Infrastructure
Post-Bid
$200,000 to $240,000 est. value
Oak Harbor, WA

SR 17, US 395 to Rd 170 - Paving
Infrastructure
Results
$1,500,000 to $2,000,000 est. value
Cedar Falls, WA

SR 20 / W Fakkema Road - Intersection Improvements
Infrastructure
Design
$804,000 CJ est. value
Ault Field, WA 98277

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

2022 Camano Island Hot Mix Asphalt Overlays
Infrastructure
Results
$1,576,000 to $1,687,000 est. value
Coupeville, WA

Last Updated 07/20/2023 03:23 PM
Project Title

Fakkema Access Road Project

Physical Address View project details and contacts
City, State (County) Oak Harbor, WA 98277   (Island County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Proposals are to be submitted only on the forms provided with the Specification. Contractors are invited to submit bids for the FAKKEMA ACCESS ROAD PROJECT in Oak Harbor, Washington. The work consists of grading, erosion control, storm drainage, water and paving necessary to build approximately 1700 linear feet of road. All work shall be in conformance with the Contract Plans, and the 2020 Standard Specifications for Road, Bridge and Municipal Construction. All bidding and construction is to be performed in compliance with the request for the Proposal, Plans, Specifications, and Contract for this project and any addenda issued thereto which are on file at the office of the City Clerk, City Hall of Oak Harbor, Washington. The Owner reserves the right to reject any or all bids, to waive irregularities or informalities in the bid or in the bidding, to accept any alternate bids, and to make such award that it deems to be in its best interest and pursuant to the terms of the General Conditions. The Owner intends to award a contract to the lowest responsible and responsive bidder. No bidder may withdraw its bid after the hour set for opening thereof or before award of the contract, which normally occurs within 45 calendar days after bid opening. The City of Oak Harbor reserves the right to postpone the award for a period of 60 calendar days after bid opening. Bid securities of the three lowest bidders will be held by the City of Oak Harbor until official award of the contract. The City of Oak Harbor in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Inquiries should be directed to The City of Oak Harbor; Brett Arvidson, P.E., Project Manager, email: barvidson@oakharbor.org, phone (360)279-452 The engineer’s opinion of probable cost ranges from $125,000 to $140,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents