Similar Projects
Z1DA--528A8-16-807 Repair Parking Lots
Post-Bid
$5,000,000 to $10,000,000 est. value
Albany, NY

Roadway Improvements
Alteration
Post-Bid
Schenectady, NY

Uptown Campus Pedestrian and Hardscape Safety Improvements
Results
Albany, NY 12222

New Parking Lot at 122 Industrial Road
Results

Quackenbush Square Site Improvements and Quackenbush Garage Convenience Entry Project
Infrastructure
Post-Bid
Albany, NY

Convert I-787 Ramp to a Multi Use Path (Albany Skyway)
Results
Albany, NY 12201

CD 21041- Maple Lane Concrete Repair
Alteration
Post-Bid
Less than $50,000 est. value
Albany, NY 12211

Maryvale Parking Lot for Apartments 293, 295, 297, 299
Alteration
Results
Less than $75,000 est. value
Schenectady, NY

Parking Lot Pavement Repair
Infrastructure
Post-Bid
Delmar, NY 12054

Demolition Services
Demolition, Infrastructure
Results
Albany, NY 12206

Streetscape Design and Construction Phase Services
Term Contract, Infrastructure
Post-Bid
Albany, NY 12243

Rehabilitate Parking Lot
Infrastructure
Results
$500,000 to $1,000,000 est. value
Albany, NY 12229

Restripe Parking Lots
Infrastructure
Post-Bid
$200,000 est. value
Albany, NY 12203

Quackenbush Square Site Improvements
Infrastructure
Results
Albany, NY

Parking Lot C Rehabilitation
Infrastructure
Post-Bid
$500,000 est. value
Albany, NY

Last Updated 07/05/2022 09:09 AM
Project Title

Pedestrian Friendly Environment Including Safe Routes to School - City of Cohoes

Physical Address View project details and contacts
City, State (County) Cohoes, NY   (Albany County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected July 2023
Bids Due View project details and contacts
Estimated Value $4,565,350
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call to construct nearly three miles of sidewalks, bike lanes and other enhancements to facilitate a pedestrian friendly environment including Safe Routes to School. As of July 1, 2022, this project is part of the Governor’s initiative with the plans include transportation improvements throughout the state. Further details regarding design and construction timelines have not been identified. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents