Similar Projects
Southwest Division Street Culvert Replacement
Infrastructure
Bidding
$400,000 to $750,000 est. value
Aloha, OR 97007

Ne 12th Avenue Stormwater Improvements
Term Contract
Post-Bid
$400,000 to $500,000 est. value
Hillsboro, OR 97123

Stormwater Management Facilities Maintenance Repair
Infrastructure
Post-Bid
Hillsboro, OR 97124

ADA Ramps - W Baseline Road
Alteration
Results
$300,000 to $400,000 est. value
OR

Early Tree Removal Project
Infrastructure
Results
Hillsboro, OR 97129

Kruger Creek Stabilization
Infrastructure
Post-Bid
$4,150,000 est. value
Tigard, OR

NW Cornell Road - NW 102nd Avenue to NW 113th Avenue
Alteration
Results
$7,000,000 to $10,000,000 est. value
OR

4140 Southwest Watson Avenue Stormwater Outfall to Beaverton Ck Retrofit
Infrastructure
Post-Bid
$1,000,000 to $1,500,000 est. value
Beaverton, OR 97005

Bateman Creek Fish Passage and Habitat Enhancement
Infrastructure, Alteration
Results
$408,000 est. value
Gales Creek, OR 97117

Certified Arborist and Tree Services
Infrastructure
Post-Bid
Sherwood, OR

US26 at Mendenhall Creek MP 45.45 to 45.71 Project
New Construction, Infrastructure
Results
$2,000,000 to $5,000,000 est. value
OR

2022 Rural Culvert Replacement Package - Marsh Road Culvert #2020, Jacktown Road Culvert #1588, Dixie Mountain Road Culvert #51849
Infrastructure
Post-Bid
$750,000 to $1,250,000 est. value
Hillsboro, OR

SW 209th Avenue SW Kinnaman Road - SW Alexander Street
Infrastructure, Alteration
Results
$15,000,000 to $25,000,000 est. value
Aloha, OR 97007

Major Storm Pipe Rehabilitation
Alteration
Results
$525,000 to $575,000 est. value
Beaverton, OR

URMD SI 192nd Av - TV Hwy-Trelane St
Demolition, Alteration
Results
$550,000 to $750,000 est. value
OR

Last Updated 06/23/2022 03:25 AM
Project Title

SouthWest Makah Court to Saum Creek Storm Line Repair

Physical Address View project details and contacts
City, State (County) Tualatin, OR 97062   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Landscaping, Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $120,000 to $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

IDENTIFICATION OF PROJECT: Major items of work consist of the following: underground pipe bursting, storm sewer utility replacement, repair of existing catch basin, slope stabilization utilizing the Envirolok geobag system, in-water work, vegetated corridor enhancements, landscaping, erosion control, and other items as called for on the plans. CONTRACT TIME: The Contractor shall begin construction work within 40 calendar days following the Notice to Proceed and no sooner than the start of the in-water work window of July 15, 2022. The contractor shall reach final completion of the project (including all punch list items) no later than September 30, 2022 in compliance with the Oregon Guidelines for Timing of In-Water Work to Protect Fish and Wildlife Resources. OTHER BID REQUIREMENTS: No proposal for a construction contract shall be received or considered by the City unless the firm is registered with the Construction Contractors Board or is licensed by the State Landscape Contractors Board, as applicable, as specified in OAR 137- 049-0230. Proposals must be made upon the Proposal form bound in the Contract Documents and must be accompanied by a certified check or proposal bond payable to the City of Tualatin (County of Washington, State of Oregon) in an amount not less than ten percent (10%) of the total amount of the bid. Every subcontract must contain a provision requiring payment of prevailing wage pursuant to the provisions of ORS 279C.800 through 279C.870. Contractor and all subcontractors must file or cause to be filed the certified statements with the BOLI, as provided in ORS 279C.845. The bid must indicate whether the contractor is a resident contractor, as defined in ORS 279A.120. RIGHT OF REJECTION: The City of Tualatin reserves the right to reject any bid not in compliance with all prescribed public procedures and requirements and may reject for good cause any or all bids upon a finding that it is in the public interest to do so. Bids cannot be withdrawn within thirty days (30) after the Bid Closing. WRITTEN ADDENDA: The City reserves the right to make changes to the Invitation to Bid and the Contract Documents by written addenda prior to the Bid Closing. Addenda shall be made available to all contractors who have joined the plan holders list on the City of Tualatin bid website, as provided in the Contract Documents. ENGINEER'S ESTIMATE: $120,000 TO $200,000

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents