Similar Projects
Rushville Treatment And Detention Facility - Building G
Addition
Conception
Less than $30,659,600 est. value
Rushville, IL 62681

Public Work Phase III and Other Improvements - City of Elmhurst
Renovation, Alteration
Conception
$2,475,000 est. value
Elmhurst, IL 60126

Champaign County Detention Center Expansion
Addition, Demolition, Infrastructure
Design
$3,000,000 CJ est. value
Urbana, IL 61802

Replace Roofing Systems and Other Improvements Vienna Correctional Center - General - Remodel and Rehabilitation
Renovation - 33,000 SF
Bidding
$800,000 CJ est. value
Vienna, IL 62995

Generator for Courhouse and Jail
Renovation
Bidding
$230,000 CJ est. value
Monmouth, IL 61462

PIF Dietary Cooler Doors
Term Contract
Sub-Bidding
Rushville, IL 62681

Replace Boilers and Controls
Renovation
Sub-Bidding
$500,000 CJ est. value
Pekin, IL 61554

HVAC Work at Mercer County Jail
Renovation, Alteration
Post-Bid
Aledo, IL 61231

Mason County Detention Roof Project
Renovation
Post-Bid
$421,000 CJ est. value
Havana, IL 62644

Provide Medical Office Space at Various Southern Locations
Renovation
Results
Less than $2,500,000 est. value
Pinckneyville, IL 62274

Franklin County Jail HVAC Upgrades
Alteration
Results
$300,000 to $400,000 est. value
Benton, IL 62812

Upgrade Main Electrical Distribution System Vienna Correctional Center
Renovation
Pending Verification
$9,444,700 CJ est. value
Vienna, IL 62995

Replace Roofing Systems and Other Improvements Vienna Correctional Center
Renovation
Bidding
$500,000 CJ est. value
Vienna, IL 62995

Testing and Remediation Services
Term Contract
Sub-Bidding
Springfield, IL 62703

Unit 5 Shower Remodel
Renovation
Post-Bid
Harrisburg, IL

Last Updated 08/09/2022 02:13 PM
Project Title

Department of Correction (DOC) Guard House K / Division XI - Cook County

Physical Address View project details and contacts
City, State (County) Chicago, IL 60632   (Cook County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids
Project Status Construction start expected June 2021
Bids Due View project details and contacts
Estimated Value $5,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DOC Guard House K / Division XI Division Xl Entrance - New Security Post As of December 18, 2018 no new CIP issued, this project is currently in the FY 2018-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2021. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2021 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents