Similar Projects
Costco Wholesale Store
New Construction - 160,000 SF
Conception
$10,000,000 CJ est. value
El Dorado Hills, CA 95762

Eighth Street Commercial Center
New Construction - 83,804 SF
Conception
$500,000 to $1,000,000 CJ est. value
Stockton, CA 95206

Quick Quack Car Wash Building Pad
New Construction, Infrastructure
Design
Cathedral City, CA 92234

Hammer Marketplace
New Construction - 16,605 SF
Design
$500,000 to $1,000,000 CJ est. value
Stockton, CA 95212

Citywide Bike Racks and Sartc Bicycle Center Rebid
New Construction
Bidding
$634,000 est. value
Santa Ana, CA

Oil Changers Zip Pit
New Construction - 2,469 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Sunnyvale, CA 94086

Oil Changers Zip Pit
New Construction - 2,469 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
San Ramon, CA 94583

Mission Street Recovery Station Project
New Construction
Results
$1,394,000 est. value
Santa Clara, CA 95050

CarMax #6012
New Construction - 9,100 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Stockton, CA 95212

AutoNation Toyota - Buena Park
Renovation, Addition - 34,625 SF
Construction
Buena Park, CA 90621

Arco Car Wash
Addition - 1,800 SF
Pending Verification
Porterville, CA

1804 N Dinuba Blvd Car Wash
New Construction - 4,400 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Visalia, CA 93291

Foothill Boulevard Mixed-Use Development
New Construction, Demolition - 119,480 SF
Conception
$10,000,000 CJ est. value
Glendale, CA 91214

Mossy Chula Vista Chrysler, Dodge, Ram & Jeep
New Construction - 55,600 SF
Design
Less than $500,000 CJ est. value
Chula Vista, CA 91911

Carmax #6163
New Construction, Renovation - 11,436 SF
Post-Bid
Oceanside, CA 92058

Last Updated 07/14/2022 02:56 PM
Project Title

Lodi Service & Car Wash

Physical Address View project details and contacts
City, State (County) Lodi, CA 95240   (San Joaquin County)
Category(s) Commercial
Sub-Category(s) Car Wash, Vehicle Sales/Service
Contracting Method Bids by Invitation.
Project Status Contract Award, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Car Wash, 1 Story Above Grade, to 1,080 SF Addition, Vehicle Sales/Service, 1 Story Above Grade, 3,187 SF Addition.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Fences and Gates, Screening Devices, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents