Similar Projects
Defense Logistics Agency (Dla) Site Improvements, Fort Meade, Md
Renovation
Design
$10,000,000 to $25,000,000 est. value
Fort Meade, MD 20755

CBIRF Obstacle Course Repairs
Renovation
Design
Indian Head, MD 20640

RFQ - Design-Build (DB)/Design-Bid-Build (DBB), Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for facilities
Term Contract
Bidding
$10,000,000 CJ est. value
Annapolis, MD 21401

C1DA--512-550 Building 361 Clinical Renovations Minor Design - Perry Point (VA-23-00009194)
Renovation - 25,000 SF
Bidding
$20,000,000 CJ est. value
Perry Point, MD 21902

East Campus Building 5 (ECB5) Pre-Construction / Construction Services
New Construction
Post-Bid
Less than $500,000,000 est. value
Fort George Meade, MD 20755

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Construct F-16 Flight Simulator Facility
New Construction - 13,000 SF
Results
$5,000,000 to $10,000,000 est. value
Joint Base Andrews, MD

Construct F-16 Flight Simulator Facility at Joint Base Andrews, Maryland
New Construction
Results
Clinton, MD

Provide and install 8 replacement coils in Wallops Flight Facility drycooler.
Renovation, Infrastructure
Design
$100,000 CJ est. value
Greenbelt, MD 20770

RFP D/B - Replace Overhead Fire Sprinkler System
Renovation
Bidding
$4,800,000 CJ est. value
Patuxent River, MD 20670

RFQ D/B - P-3005 Child Development Center, Joint Base Andrews
Demolition, New Construction, Infrastructure - 26,069 SF
Post-Bid
$25,000,000 CJ est. value
Andrews Air Force Base, MD 20762

NMLPDC1 Modernize NPDS Corridors Replace NPDS Drinking Fountains Replace NPDS Carpet
Renovation
Results
$500,000 to $1,000,000 est. value
Bethesda, MD 20814

USAMRIID Steam Sterilization Plant Effluent Decontamination System
Renovation
Design
Frederick, MD 21702

Building 678 Fire Protection Upgrades
Build-out, Renovation
Bidding
$5,000,000 CJ est. value
Indian Head, MD 20640

N4008020r0007-Card -JADOOC Renovate Satellite Site Command Trailer
Renovation
Post-Bid
Potomac, MD 20817

Last Updated 08/21/2023 07:07 AM
Project Title

B2905, B1461, B2925, B2649, & B3261, Fire Panel Replacement Bundle

Physical Address View project details and contacts
City, State (County) Patuxent River, MD 20670   (Saint Marys County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $3,200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to modernize, repair, remove, or replace the fire protection systems currently installed in Bldgs. B2905, B1461, B2925, B2649, and B3261 per SOW specifications. All terms and conditions of N40080-22-D-1113/1114/1115/1116/1117/1118 and N40080-23-D1120 Indefinite Delivery Quantity Contract apply to this solicitation. Please review your MACC award document for guidance on contract clauses and requirements that may pertain to this order. All contract clauses in the Basic Contract by reference or full text remain in effect unless superseded by this task order.You are responsible to adhere to all applicable clauses, even if they are not stated in this RFP package or the Task Order award document. For clarification on any clause or other contractual issues, please contact the POC as listed above. NAVFAC Solicitation Number: N4008022D2222 X005 NAVFAC Project No.: 1759508 Title: B2905, B1461, B2925, B2649, & B3261 Fire Panel Replacement Bundle Location of the Work: NAS PAX River, MD Description of the Work: The purpose of this project is to modernize, repair, remove, or replace the fire protection systems currently installed in Bldgs. B2905, B1461, B2925, B2649, and B3261 per SOW specifications. Design Build Budget Amount: The estimated Design Build Budget is $3.2 Million.. NAICS CODE: 236220 - Commercial and Institutional Building Construction Time for Completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work, the Government requires completion of construction within 270 calendar days after award (includes 15 calendar days for submission and approval of bonds and insurance). Wage Determination: Department of Labor (DoL) General Decision Number: MD20230008 06/02/2023 applies to this work. See Attachment B. Should this wage determination be modified by DoL prior to award, the most current wage determination will be incorporated at the time of award. The wage determination version in effect at the time of award shall apply to the work performed under this contract. Liquidated Damages: In accordance with FAR 52.211-12 Liquidated Damages Construction, Liquidated Damages will be assessed in the amount of $749 for each calendar day of delay until the work is completed or accepted. Utilities: The Contractor shall be responsible for obtaining, either from available Government sources or local utility companies, all utilities required for construction and testing. The Contractor shall provide these utilities at his expense, paid for at the current utility rate delivered to the job site. The Contractor shall provide and maintain all temporary utility connections and distribution lines, and all meters required to measure the amount of each utility used. Record Shop Drawings: In accordance with FAR 52.236.21 Specifications and Drawings for Construction, record shop drawings are required. Reproducible copies of these record drawings are also required. Bond Requirements: In accordance with FAR 28.101-4 and FAR 52.228-15 Performance and Payment Bond Construction, Performance and Payment Bonds, Bonds (Standard Form 24) in a penal sum equal to at least 20 percent of the offer price or $3,000,000, whichever is less. are required from the awardee and shall be submitted for approval to the Contracting Officer within 15 days after award of the Task Order. Commencement of construction is contingent upon approval of required bonds. An electronic copy of your bid bond must be submitted with your proposal. A hard copy of your bid bond will be requested from the apparent awardee upon confirmation of their price and must be submitted to the PCO office within one (1) buisness day from time of request. Failure to submit an electronic copy of your bid bond with your proposal will result in your proposal being deemed non-responsive and your proposal removed from consideration. Proposal Acceptance Period: Proposal acceptance period shall be 120 days from receipt of offers. Pre Proposal Inquiry (PPIs): Offerors who determine that the technical and or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. All inquiries must be made in writing and shall be submitted via email to the POC no later than 7 August 2023 at 1500 local time with inquiries attached as an Excel document (no tables please), see Attachment C. Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. A response will be published via an amendment.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents