Similar Projects
JCSA Driving and Walking Asphalt Road Surface Repairs
Post-Bid
Williamsburg, VA 23188

Asphalt Repair Svcs
Term Contract, Infrastructure
Post-Bid
Hampton, Newport News, VA

I-64 Express Lanes Expansion
Term Contract
Results

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

JCSA Driving and Walking Asphalt Road Surface Repairs
Alteration
Post-Bid
VA

2021 Plant Mix
Results
Less than $2,400,000 est. value

JCSA Driving and Walking Asphalt Road Surface Repairs
Infrastructure
Post-Bid
VA

SGR - 2021 Plant Mix
Results
Less than $7,393,000 est. value
VA

JCSA Driving and Walking Asphalt Road Surface Repairs
Infrastructure
Post-Bid
VA

JCSA Driving and Walking Asphalt Road Surface Repairs
Results
Williamsburg, VA 23185

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

2021 Street Resurfacing
Results
Williamsburg, VA

2022 Hampton Roads Full Depth Reclamation
Infrastructure
Post-Bid
$1,897,000 est. value

Asphalt Pavement Repairs at Human Service Center
Results
Williamsburg, VA 23188

Blue Heron Landing Park
Renovation, Demolition, Infrastructure, Alteration
Post-Bid
Less than $775,000 est. value

Reported 06/29/2022 03:13 PM
Project Title

Ironbound Road Improvements - Phase 3

Physical Address View project details and contacts
City, State (County) Williamsburg, VA 23188   (James City County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2025
Bids Due View project details and contacts
Estimated Value $33,124,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Ironbound Road Improvements is divided into 3 phases. Phase I included the redesign of the Longhill Road intersection and the relocation of Longhill Road. This phase was completed in FY19. Phases II & Ill of the Ironbound Road project will be completed concurrently due to available funding. The combined project includes the redesign and widening from Middle Street to Depue Drive. The planned improvement includes a roadway with three (3) lanes, pedestrian/ bicycle improvements, streetlights, underground wiring, and creating dual left turn lanes at the Richmond Road intersection. The project also includes coordination of the traffic signals at Richmond Road, Longhill Road, and Treyburn Drive. This project will be completely funded through the VDOT federal-aid Smart Scale program for a total cost of $5,235,100 in FY23-FY26. As of June 28, 2022, this project is included in the City of Williamsburg FY 2022-2026 CIP. Information regarding a design team and the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents