Similar Projects
Reported | 05/25/2022 12:00 AM |
Project Title | Fairgrounds Detention Basin and Outfall System |
Physical Address | View project details and contacts |
City, State (County) | State-Wide: NV |
Category(s) | Sewer and Water |
Sub-Category(s) | Storage/Water Tanks |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $12,400,266 to $13,705,588 |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction of a 135 acre-foot detention basin and 375-foot long emergency spillway northeast of the intersection of Heyer Street and Whipple Avenue and an outfall system along Heyer Street from the detention basin to Whipple Avenue and along Whipple Avenue from Heyer Street to the Muddy River. The outfall system consists of 1.1-miles of reinforced concrete pipe, 0.75-miles of reinforced box culvert storm drain, and associated manholes, drop inlets, and lateral storm drains. The project also includes paving and striping along Whipple Avenue and Lyman Street within the project limits. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |