Similar Projects
Route 1 Elementary School - Fairfax County Public Schools
New Construction, Infrastructure
Conception
$21,169,000 CJ est. value
Mount Vernon, VA 22309

Silver Line Elementary School - Fairfax County
New Construction, Infrastructure
Conception
$57,992,500 CJ est. value
Fairfax, VA 22030

Dunn Loring Elementary School - Fairfax County
New Construction, Infrastructure - 118,000 SF
Design
$35,332,424 CJ est. value
Vienna, VA 22182

Inova Springfield Replacement Campus - Phase 1
New Construction, Infrastructure - 438,800 SF
Design
$400,000,000 CJ est. value
Franconia, VA 22310

Methanol Feed Facilities
New Construction, Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Centreville, VA 20121

RFQ Contractor - Colvin Run Phase II @ Lake Fairfax Park
Infrastructure
Bidding
$4,000,000 CJ est. value
Reston, VA 20190

RFQ D/B - Defense Logistics Agency Overwatch Booths and Dining Patio Pavers
New Construction, Infrastructure
Post-Bid
$1,942,623 CJ est. value
Fort Belvoir, VA 22060

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Dulles Toll Road Crossing at Innovation Center
Infrastructure, Renovation
Results
$5,300,000 CJ est. value
Herndon, VA 20171

Kingstowne Consolidated Facility
New Construction, Infrastructure - 90,000 SF
Results
$63,649,000 CJ est. value
Alexandria, VA 22315

Brown's Fairfax Mazda
New Construction, Demolition - 103,064 SF
Construction
Fairfax, VA 22030

Louise Archer Elementary School - Fairfax County
Addition, Renovation, Infrastructure - 89,000 SF
Construction
$39,953,000 CJ est. value
Vienna, VA 22180

Liberty Market Mixed-Use / Lorton
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Lorton, VA 22079

Sheehy Automotive - Loisdale / Springfield
New Construction, Infrastructure - 52,000 SF
Pending Verification
$30,000,000 CJ est. value
Springfield, VA 22150

Cub Run Elementary School - Fairfax County
New Construction, Infrastructure
Conception
$61,400,000 CJ est. value
Centreville, VA 20120

Last Updated 03/10/2023 02:19 PM
Project Title

RFQ Contractor - Difficult Run Pump Station Grit Mitigation and Odor Control Improvements

Physical Address View project details and contacts
City, State (County) Great Falls, VA 22066   (Fairfax County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Fairfax County is soliciting pre-bid qualifications for the construction of the Difficult Run Pump Station Grit Mitigation and Odor Control Improvements Project. Project consist of the installation: Upgrades inside the station shall include installation of two new wastewater pumps, associated piping, valves, and variable frequency drives; replacement of ferrous sulfate storage tanks and chemical addition pumps, installation of new chemical injection port; demolition of existing chemical piping; structural repairs; and associated electrical and instrumentation and controls modifications and upgrades. Exterior improvements include modification of the diversion structure; installation of isolation gate; replacement of an existing isolation gate; and associated electrical and instrumentation and controls modifications and upgrades; and associated site work. . The General Contract for this project is anticipated to be advertised for bid in November 2022 with bid opening in December 2022. The projected Contract Award date is planned for March 2023, with an anticipated construction start of April 2023. The overall construction duration is planned to be 400 calendar days. These are estimated dates and durations and are subject to change. The cost for this project is estimated to be between $2 to $3 million.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents