Similar Projects
Metro Business and Space Center
New Construction, Infrastructure - 112,258 SF
Conception
$12,100,000 CJ est. value
Rogers, AR 72758

Nazareth Retreat Center - Phase 2
New Construction, Infrastructure - 14,880 SF
Conception
$1,500,000 CJ est. value
Fayetteville, AR 72701

Sultana Museum and Interpretive Exhibits
Renovation, Infrastructure - 23,000 SF
Design
$400,000 CJ est. value
Marion, AR 72364

Rogers Ped. Impts. (TAP-19) (S)
Infrastructure
Design
$500,000 CJ est. value
Rogers, AR 72756

Lee Creek Stream Restoration at Devil's Den State Park
Infrastructure
Bidding
$638,740 CJ est. value
West Fork, AR 72774

First Ward School into a Homeless Shelter
Renovation
Bidding
$300,000 CJ est. value
Pine Bluff, AR 71601

Lake Hamilton School District - Campus Drainage Improvements - Packages 1 Through 2
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Pearcy, AR 71964

Maintenance Warehouse Project
New Construction
Post-Bid
Pearcy, AR 71964

Maintenance Warehouse Project
New Construction
Post-Bid
Pearcy, AR 71964

LIT Vortac Relocation Access Drive and Site Grading (Harris Road)
Infrastructure
Results
Little Rock, AR 72223

Construction of the Senior Center in Mammoth Spring
New Construction, Infrastructure
Results
Mammoth Spring, AR

McReynolds Recreational Vehicle Park
New Construction
Construction
Siloam Springs, AR 72761

Lagoon and Pump Station Rehabilitation Rebid
Renovation, Infrastructure
Construction
$200,000 CJ est. value
Montrose, AR 71658

Adcock Road Office Development
Demolition, New Construction, Infrastructure - 25,402 SF
Pending Verification
$5,000,000 CJ est. value
Hot Springs, AR 71913

Midtown Bryant - Phase 3
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Bryant, AR 72022

Last Updated 10/12/2022 12:04 AM
Project Title

Arkadelphia New Elementary School

Physical Address View project details and contacts
City, State (County) Arkadelphia, AR 71923   (Clark County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

New Elementary School for Arkadelphia Public Schools Bids are to be on a lump sum basis and must be filled out on the provided bid form. Fax number is 501-228- 6616. Proposals shall include all labor, material, applicable taxes, insurance, equipment, etc., for a complete job. If your bid or proposal on this project exceeds $50,000, please send a copy of your current Arkansas Contractors License. A bid bond is required for all bids exceeding $35,000. Faxed proposals received before noon on bid date at the Nabholz Construction office are acceptable if a hard copy is received within 24 hours. Once bids are received, they will be reviewed for completeness, the responsible lowest bidder will be notified. All bids will be taken under advisement. Bidders must comply with regulatory and licensing requirements of the State of Arkansas and other applicable Arkansas statutes. To be considered, bidders must be licensed on day of bid opening. Nabholz and the Owner reserve the right to reject any or all bids and to waive any informality or irregularity in any bid. Nabholz is an equal-opportunity employer. All Women Owned Businesses (WBE), Minority Owned Businesses (MBE), and Disadvantaged Business Enterprises (DBE) including women, minority, disabled or veteran-owned business, are encouraged to submit a proposal or bid. Should you have any questions concerning this project, please email them to josh.thessing@nabholz.com. A 5% bid bond or a certified check in the amount of 5% of the bid shall accompany all bids submitted on projects that exceed $35,000 (A.C.A. 22-9-203). The bid bond shall be executed by a surety company approved by the Owner, and authorized to do business in the State of Arkansas. In lieu of bond, the Bidder may furnish a cashiers check, in an amount equal to 5% of Bid, drawn on National Bank or a Bank having a membership in the Federal Reserve System and signed by the President or Cashier. The successful bidder's security will be retained until he has signed the Contract and furnished the required Labor and Materials Payment and Performance Bond. The Owner reserves the right to retain the security of the next lowest bidder until the lowest bidder enters into contract or until 60 days after bid opening, whichever is shorter. All other bid security will be returned as soon as practicable. If any bidder refuses to enter into a contract, the Owner will retain his bid security as liquidated damages but not as a penalt Nabholz and the Owner reserve the right to reject any or all bids and to waive any informality or irregularity in any bid.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents