Similar Projects
Interstate 275 Express Lane - Florida Department of Transportation
Infrastructure
Conception
$10,000,000 est. value
Saint Petersburg, FL 33747

Pinellas Trail Loop Phase 4 from 126th Avenue North to Ulmerton Road - County of Pinellas
Infrastructure
Conception
Less than $2,180,830 est. value
Largo, FL 33773

Schooner Resort Hotel
New Construction, Build-Out, Demolition
Design
Madeira Beach, FL

Sea Captain Hotel
New Construction, Renovation - 7,885 SF
Design
$18,000,000 est. value
Clearwater, FL 33767

Seminole Square Apartments
New Construction, Infrastructure - 90,610 SF
Bidding
$13,000,000 CJ est. value
Largo, FL 33778

Seminole Square Apartments
New Construction, Infrastructure - 90,610 SF
Bidding
$13,000,000 CJ est. value
Largo, FL 33778

Imagine Clearwater Park (Buildings, Hardscape, Landscape and Other Site Improvements)
New Construction
Post-Bid
$65,000,000 est. value
Clearwater, FL 34621

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Roadways and Public Rights-of-Way Minor Improvements
Results
Saint Petersburg, FL 33731

Mill and Overlay on Various Street Locations
Results
$1,089,600 est. value
Dunedin, FL

Hampton Inn
New Construction - 56,107 SF
Construction
$3,780,000 est. value
Pinellas Park, FL 33781

AC Marriott
New Construction - 182,690 SF
Construction
$25,000,000 est. value
Clearwater, FL 33767

Miramar Beach Resort
New Construction - 47,170 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Saint Pete Beach, FL 33706

Hotel C
New Construction - 44,695 SF
Pending Verification
Clearwater, FL 33767

Tropicana Field Redevelopment / St. Petersburg
Demolition, New Construction, Infrastructure, Renovation - 12,000,000 SF
Conception
$3,800,000,000 CJ est. value
St Petersburg, FL 33705

Last Updated 08/25/2022 02:06 PM
Project Title

Beachview Inn Replacement

Physical Address View project details and contacts
City, State (County) Clearwater, FL 33767   (Pinellas County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $45,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: site work, demolition and new construction of a 14-story, 180 room hotel development. As of August 2022, construction documents are complete and permits have been issued, however the project is on hold pending funding. A general contractor has been selected.

Details

14 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents