Similar Projects
Wallowa Whitman/Umatilla National Forests Mechanical and Hand Thinning BPA
Term Contract
Design
Baker City, Pendleton, OR 97814

Wallowa Whitman/Umatilla National Forests Mechanical and Hand Thinning BPA
Term Contract
Design
Baker City, Pendleton, OR 97814

Snow Removal Services
Term Contract, Infrastructure
Post-Bid
Ontario, OR 97914

Storm Tree and Vegetative Debris Removal Services
Infrastructure
Post-Bid
OR

Refuse & Recycling Services for Bonneville Lock and Dam
Term Contract
Results
Cascade Locks, OR 97014

Englewood School Brownfield
Demolition
Results
Coos Bay, OR

Snow and Ice Control
Infrastructure
Post-Bid
Redmond, OR

Sale of Recovered Timber
Infrastructure
Results
Gates, OR 97346

Snow Removal Services For Residential Streets
Term Contract
Post-Bid
Bend, OR 97703

NE Public Trash Can Expansion
Alteration
Post-Bid
Portland, OR

Alternative Procurement for Landfill Waste Disposal
Term Contract
Post-Bid
Eugene, OR 97403

Yard Debris Grinding Services
Infrastructure
Post-Bid
Salem, OR

Refuse & Recycling Collection Sector Columbia River
Term Contract
Post-Bid
Warrenton, OR 97103

Supplying and Hauling of Crushed, Pre-Coated and Uncoated Rock for Chip Seal
Infrastructure
Post-Bid
Bend, OR

Litter Removal Services (Including Beach Cleaning) (for Buildings See 910-27)
Infrastructure
Post-Bid

Reported 03/22/2022 12:00 AM
Project Title

Road 19 Holiday Farm Fire Scaling

Physical Address View project details and contacts
City, State (County) McKenzie Bridge, OR   (Lane County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Removing on-site identified imminent hazards to Road 19 from the Holiday Farm Fire: work will consist of assessing and removing the most apparent imminent contractor (scaler) identified material from above the cut slopes and rock outcrops within the identified burned areas. Material to be removed mainly includes danger tree mitigation, but also removal of loose detached rock, downed trees laying on slope or other debris that constitutes an apparent imminent hazard to the roadway and traffic. Work included also consists of furnishing equipment and personnel to clear the travel way of material prior to the end of each day. The contractor shall furnish all supplies, materials, qualified labor, supervision and transportation required to complete the project. All scaled/felling debris is to be removed by equipment from roadway (edge of fill slope to 20' above drain ditch) prior to reopening.

Details

Division 01 - General Requirements.
Division 34 - Transportation, Schedules for Transportation, Schedules for Roadways.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents