Similar Projects
Utilities - SH008
Infrastructure
Conception
$500,000 CJ est. value
Cherokee, OK 73728

Grade, Drain, Bridge and Surface - SH 8
Infrastructure
Design
$9,000,000 CJ est. value
Cherokee, OK 73728

Grade, Drain, Bridge and Surface - SH 8
Infrastructure
Design
$9,000,000 CJ est. value
Cherokee, OK 73728

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

Slabjacking and Subsealing Services
Infrastructure
Results

Burlington Public Schools New Greenhouse
New Construction, Infrastructure - 1,500 SF
Results
$317,270 CJ est. value
Burlington, OK 73722

Utilities - US 64
Infrastructure
Design
$500,000 CJ est. value
Cherokee, OK 73728

OK Salt Plains NWR Sandpiper Trail Asphalt Paving
Term Contract
Post-Bid
$50,000 to $100,000 est. value
Jet, OK 73749

New Gymnasium and Cafeteria Buildings
New Construction, Infrastructure - 27,554 SF
Results
$8,799,000 CJ est. value
Burlington, OK 73722

Utilities - US 64
Infrastructure
Design
$1,000,000 CJ est. value
Cherokee, OK 73728

Water System Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Carmen, OK 73726

Pedestrian and Bike Improvements - US-64
Infrastructure
Results
$1,127,361 CJ est. value
Cherokee, OK 73728

Waste Water System Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Helena, OK 73741

Last Updated 04/26/2023 01:32 AM
Project Title

Right of Way - SH008

Physical Address View project details and contacts
City, State (County) Cherokee, OK 73728   (Alfalfa County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh-08: Begin at the Jct of Us-64, Extend North 7.0 Mi to the Jct of Sh-58(Row for 35841(04)) Length 7.000 Mi. As of April 26, 2023, the project is in Conceptual status. Anticipated Letting Year is 2024. OKDOT - Right of Way - SH008 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents