Similar Projects
Sawtooth Campground & Cabins
New Construction, Infrastructure
Conception
Hill City, SD

Install Cured in Place Pipe Lining in Condenser Water Piping
Term Contract
Design
Pierre, SD 57501

MIMI Replace Cathodic Protection System Components
Infrastructure
Design
$25,000 to $100,000 est. value
Philip, Wall, SD

Adams Street Water Main - West Boulevard North Thru Allen Avenue
Infrastructure
Bidding
Rapid City, SD 57701

Wolf Creek Water System Improvements
Infrastructure
Bidding
$300,000 est. value
Rapid City, SD

East 1st Street Extension
Post-Bid
$4,000,000 est. value
Tea, SD 57064

Replacing Existing Main Distribution Areas - Water Department and Installation of Flood Wall Berm at Pelican Sub - Electric Department
Post-Bid
Watertown, SD

2021 Douglas/Washington Streets
Results
Elk Point, SD 57025

Water Meter Replacement - Phase 2
Results
Brandon, SD

Saint Lawrence Utility Improvements
Infrastructure
Bidding
$2,800,000 est. value
Saint Lawrence, SD

Main Street Streetscape
Post-Bid
Vermillion, SD

Ultrasonic Meters
Results
Sioux Falls, SD

5th Street South Pressure Reducing Vault Installation and Telluride Lane Water Main Extension
Infrastructure
Bidding
$275,000 est. value
Brookings, SD

2021 Water Main Replacement Installation
Post-Bid
Wessington Springs, SD 57382

33rd Street and Minnesota Avenue Intersection Reconstruction, Utility Improvements, Pavement Repairs and ADA Improvements
Results
Less than $1,760,000 est. value
Sioux Falls, SD

Last Updated 04/28/2022 01:40 AM
Project Title

Madison Service Line Segment 2/3A Project

Physical Address View project details and contacts
City, State (County) Tea, SD   (Lincoln County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $18,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction will be on easements on privately owned lands and public rights-of-way.The Project includes the following Work: Approximately 81,300 linear feet of 16-inch diameter buried PVC or ductile iron pipe. Additionally, approximately 3,450 linear feet of pipe will be installed using horizontal directional drilling techniques. Approximately 830 linear feet of jacked or bored highway and railroad crossing casing pipe (24" diameter). Relocation and replacement of existing small diameter rural water lines and drain tile. Miscellaneous appurtenances including direct bury gate valves, manual air release valves, and blow-off assemblies. Temporary and permanent erosion control, fencing, reclamation and seeding. Corrosion protection system components including ground beds, rectifiers, galvanic anodes, and test stations. Components depend on type of pipe. Traffic control during construction. Pipeline pigging, flushing, hydrostatic pressure testing, and disinfection. And, Clean up and all other miscellaneous work required.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents