Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Blanding Site Lighting Upgrades
Infrastructure
Bidding

North Point Substation 15KV Switchgear
Alteration
Bidding
Lehi, UT

General Contractor and Electrical Contractor Timpanogos
Addition
Post-Bid
American Fork, UT

Provo River Trail Solar LED Lighting
Post-Bid
Provo, UT 84606

USDC Chiller Replacement
Results
Less than $1,150,000 est. value
American Fork, UT 84003

Pony Express ATC Replacement
Results
Eagle Mountain, UT

DFCM Construction - Pre-Qualified Mechanical - UVU UCCU Events Center Fanwall Replacement
Term Contract
Bidding
$700,000 est. value
Orem, UT 84097

Multi-Site Backup Generator Installation
Post-Bid
Provo, UT 84604

Phase II Street Lighting Project
Results
$500,000 to $600,000 est. value
Orem, UT 84057

Canterbury Apartment Lighting
Alteration
Bidding
Salt Lake City, UT 84115

Ingersoll Rand Compressed Air System Purchase and Install
Post-Bid

Electrical Services
Results

UVU Gunther Trades Cabinet Shop Dust Collector
Term Contract
Bidding
$230,000 est. value
Orem, UT 84058

Tanner to Mountain Vista OPGW Installation
Post-Bid
Provo, UT

Last Updated 01/27/2022 08:40 AM
Project Title

HVAC and Electrical Upgrade for Manila Elementary School

Physical Address View project details and contacts
City, State (County) Pleasant Grove, UT 84062   (Utah County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide: HVAC and Electrical Upgrades at Manila Elementary School. Existing HVAC system to be removed and replaced with an upgraded automatic temperature control system as indicated on drawings and within the specifications. Provision and installation of all new control valves and VFD’s. Removing existing fire sprinkler heads, and installation of an automatic fire sprinkler system is to be installed throughout the entire building in accordance with NFPA 12. Existing ceilings, lighting fixtures, speakers, to be removed and replaced. Existing radiant heaters paneling, mechanical diffusers, and intake vents to be removed.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents