Similar Projects
Bishop School Roof Replacement - Town of Arlington
Alteration
Conception
$1,600,000 est. value
Arlington, MA 02474

Public Safety Roof Replacement - FAC-6 - Town of Andover
Alteration
Design
$150,000 est. value
Andover, MA 01810

Roof Replacement at the DPW Building
Renovation - 32,000 SF
Bidding
$420,000 CJ est. value
Somerville, MA 02145

Roof Replacement for Swansea Water District
Renovation
Sub-Bidding
$86,700 CJ est. value
Swansea, MA 02777

Replace Roofing System RTI HQ 5222 - Sub Bids
Post-Bid
$2,100,000 est. value
Mashpee, MA 02649

Preparation and Install New Roof
Alteration
Post-Bid
$36,361 est. value
Lowell, MA

Town Hall Asphalt Roof and Gutter Replacement
Alteration
Results
Less than $50,000 est. value
Rockport, MA 01966

Roof Replacement and Related Improvements, Belair High Rise 24-10
Alteration
Results
$690,000 est. value
Brockton, MA 02301

Wastewater Treatment Facility Phase 2 Upgrades
Alteration
Post-Bid
$11,600,000 est. value
Hudson, MA

West End Rifle Range Roof Replacement
Alteration
Results
$15,000 est. value
Springfield, MA

Muraco Elementary School Roof Repairs And Associated Work - General
Alteration
Post-Bid
$664,000 est. value
Winchester, MA 01890

Public Meeting Room Roof Replacement
Alteration
Results
North Attleborough, MA

Tenney Grammar School
Renovation
Post-Bid
$2,700,000 CJ est. value
Methuen, MA 01844

Roof Repairs and Snow Clearing Services for Various City Building Rooftops
Alteration
Results
$150,000 est. value
Cambridge, MA

Roof Repair
Alteration
Post-Bid
Framingham, MA 01702

Last Updated 09/12/2023 03:25 PM
Project Title

Roof Replacement

Physical Address View project details and contacts
City, State (County) Fairhaven, MA 02719   (Bristol County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $232,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The Work under the Contract consists of: 1. The Project consists of: the removal and replacement of asphalt shingle roofing systems, addition of vent caps, addition of ridge vents, masonry brick repointing at chimney at 667-1. Add alternate #1 is to install river rock stone beds around perimeter of 667-1. The removal of existing asphalt rolled roofing and installation of EPDM membrane roofing system, extension of exhaust fan curbs, snow guard installation, fall protection rails at 667-2. Add alternate #1 is to install river rock stone beds around perimeter of 667-2. 2. All Work either shown on the Drawings or included in the Specifications unless specifically indicated as not to be done. B. In addition, the Work under the Contract includes: 1. Work outside the Project Site as called for in the Contract Documents and as required for the performance of the Work. 2. The restoration of any items damaged or destroyed by encroaching upon areas outside the Project Site. 3. Providing and restoring, where appropriate, all temporary facilities. Bidders requiring clarification or interpretation of the Contract Documents shall make a written request to the Prime Designer. The Prime Designer will answer such requests if received seven (7) calendar days before the date for receipt of the bids. The work is estimated to cost $347,245.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents