Similar Projects
Phase 1 - Tower Terrace Road W/O Barnsley to Alburnett Road Grading and Drainage
Conception
$4,400,000 est. value
Cedar Rapids, IA 52407

USACE UPRR Culverts CC
Conception
$5,000,000 est. value
Cedar Rapids, IA

Cedar Rapids Flood Risk Management, Reach 3, 12th Avenue SE Road Closure & CRANDIC Railroad Closure
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Cedar Rapids, IA

Cedar Rapids Flood Risk Management Project
Term Contract
Design
$10,000,000 est. value
Cedar Rapids, IA

Wanatee Tributary Restoration
Infrastructure
Post-Bid
$147,000 est. value
Marion, IA

8th Street Southwest Between 21st Avenue and 22nd Avenue Drainage Improvements
Infrastructure
Results
$20,000 est. value
Cedar Rapids, IA

NCSML Floodwall and 16th Avenue SW Road Gate
Infrastructure
Results
$7,900,000 est. value
Cedar Rapids, IA 52404

USACE McLoud Run LWR CC
Conception
$2,500,000 est. value
Cedar Rapids, IA

Cedar Lake North Shore and Levee
Infrastructure
Results
$20,840,000 est. value
Cedar Rapids, IA 52497

Phase 3 - Tower Terrace Road from C Avenue to W/O Barnsley Lane Grading and Drainage
Conception
$2,100,000 est. value
Cedar Rapids, IA 52407

Aluminum Box Culvert Stream Crossing
Infrastructure
Results
Central City, IA 52214

Sunland Drive South East South of Cottage Grove Avenue Flood Protection
Conception
$765,000 est. value
Cedar Rapids, IA 52403

USACE South Railyard Floodwall CC
Conception
Cedar Rapids, IA

USACE R1 N Railyard Levee CC
Conception
Cedar Rapids, IA

USACE Reach 4 CC
Conception
$26,800,000 est. value
Cedar Rapids, IA

Last Updated 02/03/2022 08:07 AM
Project Title

McLoud Run East Floodwall Construction

Physical Address View project details and contacts
City, State (County) Cedar Rapids, IA 52402   (Linn County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,504,558
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Generally consists of Floodwall Construction located at McLoud Run at Shaver Road NE to J Ave NE.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents