Project Title | Ryan Road Pavement Reconstruction (9 Mile Road to 10 Mile Road) |
Physical Address | View project details and contacts |
City, State (County) | Warren, MI 48092 (Macomb County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $5,200,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Job Location Ryan Road from 9 Mile Rd to 10 Mile Rd The scope of project includes concrete pavement reconstruction, miscellaneous concrete approach and sidewalk replacement, sidewalk ramp improvements as well as related appurtenances, traffic control, cleanup and restoration. The project includes the following approximate quantities: Pavt, Rem 46,760 Syd, Sidewalk, Rem 2,270 Syd, Station Grading 52 Sta, Aggregate Base , 6 inch, Modified 4,000 Syd, Aggregate Base, 10 inch, Modified 37,050 Syd, Underdrain, Subgrade, Open-Graded, 6 inch 10,790 Ft, Cone Pavt with Integral Curb, Nonreinf, 10 inch 32,360 Syd, Cone Pavt, Mise, Nonreinf, 10 inch 2,510 Syd, Driveway, Nonreinf Cone, 9 inch 3,900 Syd, Sidewalk, Cone, 4 inch 5,190 Sft, Curb Ramp, Cone, 8 inch 1,940 Sft, Surface Restoration, Hydroseeding 18,380 Syd. Road Name Ryan Rd Length 1 Mile Question Acceptance Deadline 08/03/2022 12:00 PM EDT Questions are submitted online No The scope of project includes concrete pavement reconstruction, miscellaneous concrete approach and sidewalk replacement, sidewalk ramp improvements as well as related appurtenances, traffic control, cleanup and restoration. Status: Accepted by Ashley Welker General Requirements- Bid Deposit Required - Insurance Required - Prevailing Wage Required - Certified Payroll Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Surety Bond 0.01 % - Labor and Materials Bond 100 % - Payment Bond 0.01 % |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |