Similar Projects
Gaffin Road SE Improvements - 0000253 - City of Salem
Infrastructure
Conception
$2,900,000 CJ est. value
Salem, OR 97317

Gaffin Road SE Improvements - 0000253 - City of Salem
Infrastructure
Conception
$2,900,000 CJ est. value
Salem, OR 97317

AutoZone #2227 / Salem
New Construction, Infrastructure - 5,000 SF
Design
$1,500,000 CJ est. value
Salem, OR 97317

AutoZone #2227 / Salem
New Construction, Infrastructure - 5,000 SF
Design
$1,500,000 CJ est. value
Salem, OR 97317

Pringle Elementary School
Addition, Demolition, Alteration
Post-Bid
Salem, OR

2022 Silverton Overlay Project
Infrastructure
Post-Bid
Silverton, OR 97381

Asphalt Concrete Resurfacing of Various Marion County Roads
Infrastructure
Results
$500,000 to $2,500,000 est. value
Salem, OR 97317

2022 Slurry Seal
Infrastructure
Results
Salem, OR

The Confederated Tribes of Siletz Indians Casino
New Construction, Infrastructure - 673,300 SF
Pending Verification
$280,000,000 CJ est. value
Salem, OR 97305

Del Taco / Salem
New Construction, Infrastructure - 2,400 SF
Pending Verification
$400,000 CJ est. value
Salem, OR 97305

West Salem Wastewater Pump Station Improvements - 0001063 - City of Salem
Renovation, Infrastructure
Conception
$22,510,140 CJ est. value
Salem, OR 97301

Hilfiker Lane SE at Commercial Street SE Intersection with Signal Upgrade - City of Salem
Infrastructure
Design
$4,448,690 CJ est. value
Salem, OR 97302

OR99E Salem Parkway (072) MP0 - MP5 Crack Sealing
Infrastructure
Post-Bid
Salem, OR 97317

I-5 Deck Seals
Infrastructure
Results
Salem, OR 97301

Four Corners Elementary School Expansion and Improvements - 2018 Bond - Salem Keizer Public Schools
Addition, Build-out, Renovation, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Salem, OR 97317

Last Updated 05/16/2023 02:06 PM
Project Title

2022-23 Spring Paving, Part 2 Project

Physical Address View project details and contacts
City, State (County) Woodburn, OR 97071   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $392,110 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The major items of work are estimated (approximate) quantities as follows: 1. Perform 3- inch "mill and fill" paving operation, 1,675 tons of asphaltic concrete. 2. Construct 7 new ADA ramps and concrete walks, 818 square feet. Additionally, plans have been provided to the following plan center(s): DJC Plan Center - Portland, OR There is no pre-bid conference scheduled. Those not familiar with the Project area can visit the site as depicted on the Project drawings. Bidders must be pre-qualified in accordance with the laws of the State of Oregon. Completed prequalification forms or proof of pre-qualification shall conform to the Special Provisions. Only bids from pre-qualified Bidders will be opened. No bid for a construction contract shall be received or considered unless the bidder is registered with the Construction Contractors Board. The Contractor and every Subcontractor must have a Public Works Bond filed with the CCB before starting work on the project. Bidders on this project need not be licensed for asbestos handling pursuant to ORS 468A.720. Each bidder must indicate on the bid form whether they are a resident or nonresident bidder as defined in ORS 279A.120 (b). All proposals shall be made on the proposal forms. All proposals shall be accompanied by a Bid Bond, equal to ten percent (10%) of the total bid. The form of the bid bond shall be either the Surety's standard form or the AIA form. The Bid Bond shall be forfeited to the City if the Contractor fails to execute the contract within time allotted under the specifications. Pursuant to ORS 279C.370, bidders on public works projects with an estimated value of $100,000 or more are required to disclose, two-hours after bid opening, the bidders first-tier subcontractors. The bidder shall provide the required information on the First-Tier Subcontractor Disclosure Form, provided in the contract documents. At the discretion of the Project Manager, addenda and clarifications shall either be posted on the City's Engineering Division website or delivered to Plan Holders via e-mail. Although contract award is expected to be made by the City Council on Monday, April 10, 2023, the City of Woodburn reserves the right to reject any and all bids not in compliance with prescribed bidding procedures and requirements, and may reject for good cause any and all bids upon a finding of the Agency if it is in the public interest to do so. The three (3) lowest bidders may not withdraw or modify his bid prior to the lapse of 35-days after the bid opening The Engineer's cost estimated range for the construction of this project is between: $400,000 and $600,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions regarding bidding, materials, or technical requirements should be directed to the Project Manager at: Cole Grube, Project Engineer Phone: 503.982.5241 Email: cole.grube@ci.woodburn.or.us C. Bidder is responsible for completing and returni

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents