Similar Projects
Phase IV Cemetery Improvements Northern Wisconsin Veterans Memorial Cemetery
Infrastructure
Bidding
$2,565,609 CJ est. value
Spooner, WI 54801

Minong - Hayward Construction / Resurface
Infrastructure
Bidding
$9,000,000 CJ est. value
Minong, WI 54859

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Siren - Spooner, Fosmo Drive to West Hertel Drive
Results
Siren, Spooner, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Excavation and Grading of Kilkare Road
Infrastructure
Post-Bid
$100,000 est. value
Spooner, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Business 53 Improvements
Results
Minong, WI

Spooner - Stone Lake, Crystal Brook Bridge, B-65-0060; Spooner - Stone Lake, USH 53 to South Junction CTH M
Infrastructure
Results
Spooner, WI

Spooner - Hayward, Greenwood Avenue to Poplar Street; Spooner - Hayward, Greenwood Avenue to Poplar Street
Infrastructure
Results
WI

Crack Seal, Micro-Surfacing, Slurry Leveling, and Pavement Marking
Infrastructure
Results
Burlington, Clintonville, Eagle River, Monroe, Osceola, Shell Lake, Sturgeon Bay, Waukesha, Waupaca, Wisconsin Rapids, WI

New Auburn - Spooner, Pine Grove Road to Wildcat Road, NB and SB
Infrastructure
Results
$15,000,000 to $16,999,999 est. value
WI

Last Updated 08/29/2022 11:32 PM
Project Title

Minong Campground Expansion

Physical Address View project details and contacts
City, State (County) Minong, WI 54859   (Washburn County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $428,487 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Sanitary Sewer (Gravity), Water Utilities, Electrical and Controls, Culverts, Waterways, Stormwater Channels, Utility Street Construction and Excavation, Electrical Installation/Construction, Sewer and Water Construction, Erosion Control/Slope, Bank Stabilization, Sitework/Excavating and Grading, Fencing/Guardrails/Handrails, Grade and Surface, Water and Wastewater Facilities, Grubbing & Clearing, Stormwater Improvements, Erosion Control - Temporary The Project includes the following work: Campground expansion of 10 new sites. Work includes extension of approximately 400 feet of 8-inch sanitary sewer and 3-inch water main. Other work includes creation of gravel roads and camper pads, electrical work, excavation of a stormwater pond, and installation of split rail fence. Bids will be received for a single prime Contract. Bids shall be on a unit price basis as indicated in the Bid Form. Bids shall be on the forms provided for that purpose and per the Contract Documents prepared by CBS Squared Inc. identified as "Minong Campground Expansion". The Issuing Office for the Bidding Documents is: CBS Squared, Inc. located at 770 Technology Way, Chippewa Falls, WI 54729. Contact person is: Tyler Hastings, 715.505.8633, thastings@cbssquaredinc.com. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. Bidder is required to deliver the original certified check or bid bond within 72 hours of the bid opening to CBS Squared, Inc., ATTN: Tyler Hastings, 770 Technology Way, Suite 1A, Chippewa Falls, WI 54729. The certified check or bid bond will be returned to the bidder in accordance with the Instructions to Bidders. The Village of Minong reserves the right to retain the deposits of the three (3) lowest bidders for a period not to exceed 30 days after the date and time set for the opening of bids. No bids may be withdrawn for a period of 30 Days after the date and time set for the opening of bids. Bidders Proof of Responsibility must be submitted in accordance with the Instructions to Bidders. Bidders will be required to provide performance and payment bonds of 100 percent of bid amount. This Contract is expected to be funded in part with funds provided by the Wisconsin Department of Natural Resources. Information on applicable federal requirements is contained in the Project Manual. The successful bidder will be required to conform to the wage requirements prescribed by the federal Davis-Bacon and Related Acts which requires that all laborers and mechanics employed by contractors and sub -contractors performing on contracts funded in whole or in part with federal funds in excess of $2,000 pay their laborers and mechanics not less than the prevailing wage rates and fringe benefits, as determined by the Secretary of Labor, for corresponding classes of laborers and mechanics employed on similar projects in the area. If the requirements of Davis Bacon, the State of Wisconsin and the Contract requirements conflict with regard to wages, the highest of the three shall apply. Equal Opportunity and Affirmative Action requirements apply to this Project. The Village of Minong reserves the right to reject any and all bids, without cause, to waive irregularities and informalities therein and to award the Contract in the best interest of the Village of Minong.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents