Project Title | Berth 46 - Outer Harbor Cruise Terminal AMP - Port of Los Angeles |
Physical Address | View project details and contacts |
City, State (County) | Los Angeles, CA (Los Angeles County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Conceptual Design |
Bids Due | View project details and contacts |
Estimated Value | $35,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This $35.0 million project includes the design and installation of a new 11 kilovolt (KV) AMP(R) system for cruise ships at Berth 46. Work includes construction of a new Los Angeles Department of Water and Power (LADWP) 34.5 KV industrial station, new 34.5 KV switchgear, a new 18 mega volt ampere transformer equipped with Automatic Load Tap Change (ALTC) to automatically adjust the necessary transformer tap changes under load, new 11 KV AMP(R) switchgear, two new 11 KV wharf AMP(R) outlets, and an 11 KV AMP(R) mobile cable management for cruise ship connections. In addition, this project requires the extension of a new LADWP 34.5 KV circuit through an existing LADWP underground conduit (from 22nd Street to Berth 46 along Miner Street). Design is expected to be complete sometime in 2023. The project is included in the Port of Los Angeles' FY 2022-2023 Capital Improvement Program (CIP). As of June 10, 2022, Information regarding a design team and a general contractor is not available. Design is anticipated to be completed in 2023. A timeline for construction has not been determined.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |