Similar Projects
Last Updated | 02/21/2020 09:08 AM |
Project Title | Turner Street Sidewalk Project |
Physical Address | View project details and contacts |
City, State (County) | Auburn, ME (Androscoggin County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $150,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. The construction of approximately 0.32 miles of sidewalk, mostly along the south side of Turner Street starting at the back entrance to the Auburn Mall (near TD Bank) and extending northerly towards Gracelawn Road. 2. Provide a mid-block crossing with rectangular flashing beacons to access the new development at Gracelawn Road. 3. Provide new granite and bituminous curbing and curb tip downs. 4. Replace existing guardrail in select locations. 5. Remove and reset three existing light poles on south side of Turner Street. 6. Install new fencing along a portion of the development at Gracelawn Road. 7. Provide minor drainage improvements, including two (2) new catch basins. 8. Loam,seed and mulch as directed. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |