Similar Projects
Polk-Quincy - 701048.0 - City of Topeka
Infrastructure
Conception
$7,000,000 est. value
Topeka, KS

South Kansas Avenue(4th to 6th Avenue) - 841095 - City of Topeka
Alteration
Conception
$892,045 est. value
Topeka, KS 66630

BRVB - Pavement Resurfacing and ADA Improvements
Infrastructure
Design
$25,000 to $100,000 est. value
Topeka, KS 66612

Milling and HMA Overlay
Infrastructure
Bidding
$800,000 est. value
Hays, Topeka, KS 66614

Street Improvement Project
Infrastructure
Bidding
$5,000,000 est. value
Topeka, KS

14th Street Improvements
Infrastructure
Post-Bid
Auburn, KS

South Topeka Blvd BNSF Rail Crossing Removal & Pavement Replacement
Infrastructure
Post-Bid
Topeka, KS

Micro-Surfacing 2021
Infrastructure
Results
Topeka, KS

2021 City Wide Temporary Cap Replacement
Infrastructure, Alteration
Results
Topeka, KS

South Topeka Boulevard from 15th to 21st - 701045 - City of Topeka
Infrastructure
Conception
$4,700,000 est. value
Topeka, KS 66630

Repairs and Striping at the Detention Facilities
Infrastructure
Bidding
$60,000 est. value
KS

Fire Stations Paving Repairs
Infrastructure
Post-Bid
$200,000 est. value
Topeka, KS

City Street Repair
Infrastructure
Results
Topeka, KS

S. Topeka Blvd from 29th Street to 37th Street - 701038
Alteration
Conception
$2,343,290 est. value
Topeka, KS 66612

Street Improvement Project
Infrastructure
Bidding
$500,000 est. value
Topeka, KS 66604

Reported 07/13/2022 03:09 PM
Project Title

Sw Huntoon Street To Sw Executive Drive - 701029

Physical Address View project details and contacts
City, State (County) Topeka, KS 66612   (Shawnee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected September 2024
Bids Due View project details and contacts
Estimated Value $3,870,345 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The SW Huntoon Street project between SW Executive Drive and SW Urish Road involves the complete reconstruction of SW Huntoon and is the continuation of previous improvements to Huntoon that were constructed in FY2018. The previous project was between I-470 and Executive Drive, and this project picks up at Executive Drive and continues west to Urish Road. The improvements will likely consist of a 3-lane section with enclosed storm and sewer infrastructure. It is possible that a waterline replacement/extension project may be included. The final configuration will be determined early in the design phase. NOTE: A portion of this road is in Shawnee County (not within the annexed portion of Topeka). As of July 12, 2022, this project is currently in the FY 2023-2032 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents