Similar Projects
Pana PAC Building
New Construction
Bidding
$1,000,000 est. value
Pana, IL

FY23 Utility Maintenance
Infrastructure
Bidding
$396,000 est. value
Bloomington, IL

Water Main Valve Exercising
Term Contract
Post-Bid
Orland Park, IL

Phase III Construction Engineering Services for McCormick Park Area Water Main Upgrade
Post-Bid
Crystal Lake, IL

Dogwood Street Water Main Replacement
Results
$1,000,000 to $5,000,000 est. value
Park Forest, IL 60466

Garnsey Park Phase 2 Water Main Improvements
Results
Less than $2,263,890 est. value
Joliet, IL 60435

Vetter Road Segment II Roadway Reconstruction & Realignment Drainage Improvements
Addition
Construction
Joliet, IL

Water System Improvements - Phase I
Infrastructure
Bidding
$700,000 est. value
Donovan, IL

Elizabeth Street and Appletree Court Water Main Improvements
Post-Bid
Yorkville, IL 60560

Reedwood Phase 1A Water Main Improvements
Results
Less than $850,000 est. value
Joliet, IL 60436

Replace Water Meters
Infrastructure
Bidding
$517,000 est. value
Roberts, IL

Water Main Installation Services
Post-Bid
Springfield, IL

Florence Park Phase 1A Water Main Improvements
Results
Joliet, IL 60433

Chalmers- Utility Vault Repair - Only Pre-Qualified Various Trades Pool
Infrastructure
Bidding
$250,000 est. value
Chicago, IL 60608

Revise Domestic Water System - Division 01
Post-Bid
Chicago, IL 60612

Reported 04/15/2022 12:00 AM
Project Title

Lead Service Line Replacement Phase 4

Physical Address View project details and contacts
City, State (County) Rockford, IL   (Winnebago County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Lead Water Service Line Replacement for residential homes in Rockford, Illinois. This work will consist of approximately 576 replacements through either open-cut trenching operations or directional boring of the water service line. Existing lines are to be abandoned in place upon successful connection of newly installed pipe. Proposed construction improvements include: replacement of existing lead water service lines on both the public and private side of the right-of-way. Public replacements will run from the water main to the right-of-way and private replacements will run from the right-of-way line to the meter connection point.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents