Similar Projects
Reported | 08/13/2021 12:43 PM |
Project Title | Provide, Install, and Maintain A 2.5Gb Wave Service Between Bldg 747, Room 209, 240 Knapp Blvd, Nashville, Tn And Bldg 859, Switch Room (Dco), 325 East Moore Drive, Maxw |
Physical Address | View project details and contacts |
City, State (County) | Nashville, TN (Davidson County) |
Category(s) | Industrial/Manufacturing |
Sub-Category(s) | Communication Lines |
Contracting Method | |
Project Status | Abandoned |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 2.5GB Wave Service Must Be Terminated To The Line Side Of The Fiber Terminating Patch Panel Installed In The Disa Ie1 Provided Odxc Suite At Berry Field And The Fiber Terminating Patch Panel Installed In The Disa Ie1 Provided Odxc Suite Installed At Gunter Annex. Once Telecom Provider Has Completed Inside Wiring From Their Fiber Distribution Panel Installed In Their Dwdm Equipment Suite To The Government Service Delivery Point (Sdp) At Each Location, They Must Ensure The Light Level Readings (Db Loss) Are Adjusted To Read -5 To -13 Loss. Additionally, These Levels Must Be Documented On The Notice Of Completion (Noc) Sent To Ditco. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |