Similar Projects
Last Updated | 03/18/2019 08:56 AM |
Project Title | Westerly CSOTF Boiler Replacement |
Physical Address | View project details and contacts |
City, State (County) | Cleveland, OH 44102 (Cuyahoga County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $440,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | CSOTF Pump Building - Replace two (2) heating hot water boilers with two (2) new 2,000 MBH condensing boilers. Including new flue piping, air and dirt separator, expansion tank, hydronic piping, gas piping, insulation, valves, gauges, electrical, controls and all associated accessories. Locker/Storage Building - Replace one (1) heating hot water boiler with one (1) new boiler to match the other existing boiler installed in 2010. Including new hydronic piping, gas piping, insulation, valves, gauges, electrical, controls and all associated accessories. Boiler Controls - The boiler control systems shall be comprised of a network of interoperable, stand-alone digital controllers communicating via current BACnet communication protocols to a JACE N4 platform. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |