Similar Projects
Reported | 02/07/2020 12:00 AM |
Project Title | Bar Screen Upgrades / St Louis Correctional Facility |
Physical Address | View project details and contacts |
City, State (County) | Saint Louis, MI 48880 (Gratiot County) |
Category(s) | Professional Services |
Sub-Category(s) | Architectural, Engineering |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFP) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Michigan Department of Corrections is requesting PSC proposals for the sewage pumping station and screening facility that is utilized by St Louis Correctional Facility and Central Michigan Correctional Facility. The screened sewage is then sent onto the City of St Louis for final processing. The St Louis Correctional Facility is a Level IV facility which can house up to 1176 prisoners plus staff. The Central Michigan Correctional Facility is a Level I facility which can house up to 2560 prisoners plus staff. The work is to include Phases 300, 500, 600 and 700 with a complete drawing package for permitting, bids and construction to repair and/or replace the existing bar screen building and equipment. Building replacement will be based on new equipment sizes and accessibility for installation of the equipment if required. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |