Similar Projects
CoStar Group
New Construction - 400,000 SF
Conception
$1,500,000,000 est. value
Richmond, VA

The Results Companies
Renovation
Design
Midlothian, VA 23113

Financial Consulting Group
New Construction - 1,800 SF
Design
$150,000 est. value
Richmond, VA 23225

Design and Construction of a Headquarters Expansion, Parking Facilities
New Construction - 130,000 SF
Post-Bid
Richmond, VA 23220

Activation Capital 8L Early Release
New Construction - 99,511 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Richmond, VA 23219

Y--Renovate Offices #652-19-901
Renovation
Results
$25,000 to $100,000 est. value
Richmond, VA

PIEtech
Renovation
Construction
$222,743 est. value
Midlothian, VA

Gallery5 Building
Renovation - 7,000 SF
Construction
$500,000 to $600,000 est. value
Richmond, VA

700 Canal Place
New Construction, Demolition
Pending Verification
Richmond, VA

Iron Bridge Development
New Construction
Pending Verification
Chesterfield, VA 23832

Motion Industries
Renovation
Design
$68,000 est. value
Richmond, VA 23237

Captech Tenant Renovations
Renovation - 12,619 SF
Post-Bid
Richmond, VA

Chesterfield Place
New Construction - 9,102 SF
Construction
$489,940 est. value
Richmond, VA 23235

Oak Hill East Shopping Center
New Construction - 40,200 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Richmond, VA 23238

Edward Jones #48113
Renovation - 1,200 SF
Post-Bid
Chester, VA 23836

Last Updated 05/23/2019 01:24 PM
Project Title

The Community Foundation Expansion - Fit-Out

Physical Address View project details and contacts
City, State (County) Richmond, VA   (Chesterfield County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method
Project Status Construction Commenced December 2018, Construction Complete as of May 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description New tenant interior, existing tenant just moving in is expanding to adjacent space, new MEP items, HVAC, two new restrooms, exercise rooms, open offices, conference room. Space is slab on grade, fire alarm is design build, slab to deck is 15'+/-, concrete pour back to be 3000 PSI with vapor barrier, furnish and install dowels every 2\ use spray lock treatment on slab, repair exterior concrete where sanitary ties in underground exterior of building, include bollard replacement. Masons to repair area where sanitary exits building, Door vendors to include cores for Schlage C keyway, 6 pin, locks to come zero bitted, Schalge AL grade #2 lever sets, all PF doors to be ASSA Abloy Plain sliced white birch #850, SS1 stain group, ACES is required building EMS vendor, building.
Details 1 Office, 1 Story Above Grade, 3,659 SF Renovation.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Thermal Insulation.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Painting.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents