Last Updated | 12/20/2021 11:22 PM |
Project Title | Ac Water Main Replacement - Phase Two |
Physical Address | View project details and contacts |
City, State (County) | Bellevue, WA (King County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Description Work contemplated to be performed under this contract is as follows: Constructing approximately 9,230 LF of ductile iron water mains Installing new fire hydrant assemblies, Installing replacement water services, Constructing a replacement 6” x 2” Pressure Reducing Station in concrete vault, Constructing approximately 290 LF of PVC drain pipe, Construction dewatering, Relocating existing utilities (as required), Abandoning asbestos cement pipe, Restoring surface conditions, including asphalt trench patching and concrete curbs, gutters, and sidewalks, Performing traffic control, Other work as required to complete the project. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |