Similar Projects
Chiller Acquisition
Renovation
Sub-Bidding
$300,000 CJ est. value
Spartanburg, SC 29306

Replace Selected Existing Heat Pumps in Villas 2, 3, 4 & 5
Renovation
Sub-Bidding
$210,000 CJ est. value
Spartanburg, SC 29303

New HVAC System for Meter Shop
Alteration
Post-Bid
Spartanburg, SC

SCC - BMW Office Facility HVAC
Alteration
Post-Bid
$60,000 to $70,000 est. value
Duncan, SC 29334

Byrnes High School Cooling Tower Replacement
Alteration
Results
Duncan, SC 29334

Tyger River Kitchen Hood Repair
Alteration
Results
Enoree, SC 29335

2023 HVAC Program (High Street, Collins Avenue. Fulton Avenue, Fisher Avenue.)
Renovation
Sub-Bidding
$20,000 CJ est. value
Spartanburg, SC 29306

HVAC Filters
Alteration
Post-Bid
Spartanburg, SC

HVAC Unit
Alteration
Results
Enoree, SC 29335

Install HVAC Building Management Control System
Renovation
Post-Bid
$500,000 CJ est. value
Spartanburg, SC 29306

HVAC Filter Replacement
Alteration
Results
SC

Spartanburg Community College - HVAC Projects; Evans Cooling Tower Replacement
Renovation
Post-Bid
$165,000 CJ est. value
Spartanburg, SC 29302

Water Treatment Services for HVAC Systems
Alteration
Results
$9,900 est. value
Spartanburg, SC

HVAC Projects - Tyger River Warehouse Boiler Replacement
Renovation
Post-Bid
$248,000 CJ est. value
Duncan, SC 29334

HVAC Comprehensive Maintenance and Emergency Response Services
Alteration
Results
SC

Last Updated 03/24/2023 05:12 PM
Project Title

Boiler Replacement at MES, BSE, BSM, and CSM

Physical Address View project details and contacts
City, State (County) Chesnee, SC 29323   (Spartanburg County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $537,980 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Spartanburg School District Two (hereinafter, "the District") invites all qualified providers to submit sealed bids for boiler replacement at Mayo Elementary and Boiling Springs Elementary, Boiling Springs Middle School, and Chesnee Middle School complying with the enclosed description and/or specifications and conditions for this solicitation. Spartanburg County School District 2 is located in the northwestern part of Spartanburg County, and includes the Town of Chesnee and the communities of Boiling Springs, Fingerville, and Mayo. A small portion of the District is located in Cherokee County. The District encompasses a land area of approximately 134 square miles. The District is made up of 2 high schools, 1 Freshman Academy, 3 middle schools, and 9 elementary schools. The District currently has an annual budget of over $104 million, and over 11,000 students including pre-K, and employs approximately 1,250 employees. Submit questions to: Matt Pettit Matthew.pettit@spart2. Questions must be received by : March 13th, 2023 It is the intent of Spartanburg School District Two (hereinafter referred to as the "District") to solicit bids for boiler replacements at Mayo Elementary, Boiling Springs Elementary, Boiling Springs Middle, and Chesnee Middle School. Mayo Elementary - Remove 1 Burnham boiler and replace with 2 Lochinvar Crest (FBN0751) condensing natural gas boilers 750,000 BTU per hour. Installation of by-pass chemical feeder. Boiling Springs Elementary - Remove 1 Weil McLain boiler and install 1 Lochinvar Crest Condensing natural gas boiler - option 1 - 2,500,000 BTU per hour (FBN2501), or option 2 - 2,000,000 BTU per hour (FBN2001). Boiling Springs Middle School - Remove 1 Weil McLain boiler and install 1 Lochinvar Crest condensing natural gas boilers - option 1 - 4,000,000 BTU per hour (FBN4001), or option 2 - 3,500,000 BTU per hour (FBN3501). Chesnee Middle School - Remove 2 Weil McLain boilers and replace with 2 Lochinvar Crest (FBN1501) condensing natural gas boilers 1,500,000 BTU per hour General Specifications for all of these jobs include: 1. Include Neutralization kit for drain 2. Gas regulators 3. Bell and Gossett Circulating pumps 4. Demo old boilers and piping for new connections 5. New piping as required to be 40 black steel with welded or groove fittings 6. Gas piping to be schedule 40 black steel welded or threaded pipe 7. Insulation to be 1-1/2 inch fiberglass with ASJ covering and PVC vinyl coverings for all fittings 8. All electrical and control hook ups included 9. All exhaust venting and any roof penetration to be included, utilize existing where possible 10. Remove and dispose of old boilers 11. Hook up gas, water, electrical as required 12. Utilize existing control wiring, if possible, any new control wiring to be provided by owner 13. No asbestos allowed 14. Ensure emergency stop function if existing. If boiler e-stop does not exist - installation required. 15. These are turnkey jobs with manufacturing support startup This solicitation does not commit Spartanburg School District Two to award a contract, to pay any costs incurred in preparation of a bid, nor to procure any services that may be offered. INSTALLATION: These projects will be installed over Summer Break 2023, to be completed by August 2, 2023.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents