Similar Projects
Ponte Vedra Self-Storage
New Construction - 108,000 SF
Conception
$10,000,000 CJ est. value
Ponte Vedra, FL

Elevation Pointe
New Construction
Design
Saint Augustine, FL

Elevation Pointe
New Construction
Design
Saint Augustine, FL

Flagler Estates Park Community Center
New Construction
Bidding
Hastings, FL 32145

Swimming Safari School
New Construction - 12,000 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Saint Augustine, FL

District 2 St. Augustine Maintenance Metal Buildings Replacement
Results
Saint Augustine, FL 32084

Installation of Pole Barns for SJC Road and Bridge Division
Results
FL

Saint Johns Golf and Country Club
Addition - 14,526 SF
Construction
$2,500,000 est. value
Saint Augustine, FL 32092

Del Webb Nocatee Amenity Center
New Construction - 22,824 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Ponte Vedra, FL

Beachwalk Apartments - Phase II
New Construction
Pending Verification
Saint Augustine, FL

Scannell Industrial Park - Beachwalk North
New Construction - 4,390,000 SF
Pending Verification
$10,000,000 CJ est. value
Saint Augustine, FL 32095

First Coast YMCA
New Construction, Build-Out - 40,000 SF
Design
$7,000,000 est. value
Saint Johns, FL

Commercial Swimming Pool Refinishing Project
Results
Saint Augustine, FL 32084

Vicar's Landing at Oak Bridge
New Construction - 21,000 SF
Construction
$162,000,000 est. value
Ponte Vedra Beach, FL 32082

Madison Nocatee
New Construction
Pending Verification
Ponte Vedra, FL

Reported 07/19/2021 12:48 PM
Project Title

Silverleaf Village Amenity Center

Physical Address View project details and contacts
City, State (County) Saint Augustine, FL 32244   (Saint Johns County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club, Swimming Pool(s), Warehouse/Storage
Contracting Method
Project Status Building in Operation as of March 2021
Bids Due View project details and contacts
Estimated Value $2,363,610
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

6,770 SF - Clubhouse/Social Club, 6,400 SF New Construction, Warehouse/Storage, 370 SF New Construction, 2 Swimming Pool(s), Demolition, New Construction, Tennis Court(s).
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents