Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

Y--Price Canyon Recreation Site Road Improvements
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Udot Region 4 Wash Rack Installation Various Locations
Term Contract, Infrastructure
Results

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

SR-12; Escalante Main To MP 70
Infrastructure
Results
$4,000,000 to $6,000,000 est. value
UT

Improvements to the Panguitch Municipal Airport
Infrastructure
Post-Bid
Panguitch, UT 84759

Asphalt Preservation and Re-striping and Seal Coat at Bryce Canyon National Park
Infrastructure
Results
$100,000 to $250,000 est. value
Bryce, UT

Contractor - Construction of Highways, Streets, Bridges, and Railways
Infrastructure
Post-Bid
$1,000,000 to $5,000,000 est. value
Lake Powell, UT

DFCM Construction Multi Step Const-escalante State Park Day Use and Campground Improvements
Infrastructure
Post-Bid
$4,600,000 CJ est. value
Escalante, UT 84726

Antimony Town Well Project - Well Drilling
Infrastructure
Post-Bid
$360,000 CJ est. value
Antimony, UT 84712

SR-143; Slope Stabilization and Flood Repair Drainage
Infrastructure
Bidding
$10,000,000 CJ est. value
Panguitch, UT 84759

SR-143; Slope Stabilization and Flood Repair Drainage
Infrastructure
Bidding
$10,000,000 CJ est. value
Panguitch, UT 84759

SR-143; Slope Stabilization and Flood Repair Drainage
Infrastructure
Bidding
$10,000,000 CJ est. value
Panguitch, UT 84759

Last Updated 09/29/2022 10:04 AM
Project Title

Re-Stripe Park Roads, Centerline and Fog Lines

Physical Address View project details and contacts
City, State (County) Bryce Canyon City, UT 84764   (Garfield County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Location: Bryce Canyon National Park, Bryce Canyon, Utah 84764 Re-Striping Park roadway pavement markings. Roads to be striped with centerline and fog lines are: o Main Park Road (Rainbow Point Rim Road, 45rt 0010) o Sunrise Loop Road (rt 0202) from Lodge Loop Road to North Campground Road (~570 LF) o Sunset Point Road (rt 0203) o Bryce Point Road (rt 0100) o Inspiration Point Road (rt 0204) o Paria View Road (rt 0205) o Farview Point Access Road (part of rt 0922) A total of approximately 21.0 miles all with 4" double yellow centerline and 4" white fog lines on each side of the road with reflectorized beads added to paint. Roads to be striped with centerline only are: o Fairyland Spur Road (rt 0200) o Lodge Access Road (rt 0207) o Mixing Circle Road (rt 0401) o North Campground Road (rt 0201) A total of approximately 2.1 miles all with 4" double yellow centerline only with reflectorized beads added to paint. Roads to be striped with fog lines only: o Sunrise Point Road (rt 0202), 0.5 mile A total of 0.5 miles with 4" white fog lines on each side of the road with reflectorized beads added to paint. A total of approximately 23.6 miles of road will be striped with centerline and fog lines, centerline only, or fog lines only PRE-SOLICITATION NOTICE AMENDMENT Amendment to correct an error within the document text. RE-STRIPE PARK ROADS, CENTERLINE AND FOG LINES BRYCE CANYON NATIONAL PARK, UT BRCA 249697 DATE: March 15, 2022 TITLE OF PROJECT: Re-Stripe Park Roads, Centerline and Fog Lines PROJECT MAGNITUDE: Between $25,000 and $100,000 NAICS 237310: Highway, Street, and Bridge Construction with a size standard of $39.5 Million PRODUCT SERVICE CODE: Z1LB: Maintenance of Highways, Roads, Streets, Bridges, and Railways SET-ASIDE: Total Small Business CONTRACTING OFFICE ADDRESS: National Park Service Regional Office Serving Interior 6, 7, & 8 Lakewood Major Acquisition Buying Office 12795 West Alameda Parkway PO Box 25287 Denver, CO 80225-0287 POINT OF CONTACT: Patricia (Patti) Auten, Contracting Officer patti_auten@nps.gov or (720) 527-1485 PLACE OF PERFORMANCE: Bryce Canyon National Park, UT DESCRIPTION: This work consists of applying paint and reflectorized beads on road surfaces over existing road markings for delineation of roadways. The Contractor shall provide all equipment, labor, materials, quality control, safety, traffic control, and supervision to paint all stripes and pavement markings of roadways as listed in the Statement of Work (SOW). The Contractor shall perform all work in accordance with Supplemental Specification 2012 Standard Specification Book. SECTION 02765M, PAVEMENT MARKING PAINT. A. Traffic markings shall be in accordance with Utah Department of Transportation (UDOT) SPECS. PERIOD OF PERFORMANCE: Estimated period of performance is August 1, 2022, through August 31, 2022. PROPOSED SOLICITATION NUMBER: 140P1222Q0034 PROPOSED SOLICITATION ISSUE DATE: Estimated on or about March 29, 2022. SOLICITATION LOCATION: The Request for Proposal (RFP) will be posted on Contract Opportunities at www.SAM.gov QUESTIONS: All questions regarding the subject requirement shall be submitted via email to the Contracting Officer at patti_auten@nps.gov. Please include the solicitation number, company name, address, telephone number, email, and contact name on any correspondence. The Government anticipates awarding a single firm fixed price contract. Awarding to the lowest price offer that meets the minimum submittal specifications. Prospective offerors desiring to conduct business with the Department of Interior are required to have an active registration in the System for Award Management (SAM) at www.sam.gov at the time of award. This pre-solicitation announcement is not a solicitation document, but pre-notice of an upcoming solicitation. Specific instructions on submitting your proposal will be contained in the solicitation documents to be issued on or about March 29, 2022. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents