Similar Projects
Tree Clearing and Surface Patching - Sawmill Rail Trail
Infrastructure
Bidding
$130,000 CJ est. value
Balsam Lake, WI 54810

Snow Plowing Services
Term Contract
Sub-Bidding
Amery, WI 54001

Blacktop
Infrastructure
Post-Bid
Clear Lake, WI 54005

Paving of 75th Street
Infrastructure
Post-Bid
$700,000 est. value
Amery, WI 54001

Star Prairie - Osceola, Scl to Cth Y
Results
Osceola, Star Prairie, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2022 Luck Street Construction - Pulverizing and Paving
Infrastructure
Post-Bid
$200,000 est. value
Luck, WI 54853

Kentucky and River Street Improvements
Results
Saint Croix Falls, WI 54024

Road Work
Infrastructure
Post-Bid
$180,000 est. value
Balsam Lake, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Seasonal Road Maintenance
Infrastructure
Post-Bid
Amery, WI

Milltown Avenue Reconstruction
Results
Milltown, WI

Roadwork Bids
Infrastructure
Post-Bid
Saint Croix Falls, WI

Resurface 1 Mile of 190th Street from 190th Avenue to 180th Avenue
Infrastructure
Results
WI 54024

Local Road Improvement
Infrastructure
Post-Bid
$180,000 est. value
Turtle Lake, WI 54889

Last Updated 08/04/2022 03:06 PM
Project Title

2022 Road Improvements

Physical Address View project details and contacts
City, State (County) Osceola, WI 54020   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $410,888 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of 08/04/2022 Start date: Will start a week or two End date: Early September The Town of Osceola, Polk County is accepting bids for grinding and repaving on 110th Avenue and 200th St. Project 1: 110th Ave, from 210th St. to 195th St., approximately 1.5 miles x 20'. Project 2: 200th St., from 110th Ave. to 120th Ave., approximately 1.02 miles x 21'. Work to be provided will consist of pulverizing the existing road, fine grade and compact, pave 2.5" compacted HMA with 2' shoulders. For additional information contact the Public Works Supervisor, Todd Raddatz at 715-417- 4681. The Town of Osceola reserves the right to reject or accept any and all bids most advantageous to the Town of Osceola. Bid Results:- 1. Project 1, 110 th Ave: 210th St. to 195th St.: $ 243,669 2. Project 2, 200 th St: 110th Ave. to 120th Ave.: $167,219

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents