Similar Projects
Gateway Industrial Park Water System
Infrastructure
Post-Bid
MS

2021 Empson Street Elevated Water Storage Tank Rehabilitation
Infrastructure
Post-Bid
McComb, MS

Caine Circle Elevated Tank Modifications
Results
Brandon, MS

Water Tank Rehabilitation
Results
Clinton, MS

John Allen Remove Design Build New Tank
Term Contract
Post-Bid
$75,000 to $80,000 est. value
Tupelo, MS

Contract 3 Elevated Water Tank - Drinking Water System Improvements
Results
$806,000 est. value
Lucedale, MS

Rehabilitation and Repainting of a 200,000 Gallon Elevated Water Tank
Renovation, Alteration
Post-Bid
Brandon, MS

Thomas Street 200,000 Gallon Elevated Storage Tank Rehabilitation
Infrastructure
Results
Summit, MS

Magee Industrial Site: Contract B - Elevated Water Tank
Infrastructure
Post-Bid
Pontotoc, MS

Elevated Tank Repainting
Infrastructure
Results
Richland, MS

NTS Water Association
Infrastructure
Post-Bid
Meridian, MS

Gore Springs Water System Improvements - Contract C - 20,000 Gallon Elevated Tank
Infrastructure
Results
Gore Springs, MS

NTS Water Association
Infrastructure
Post-Bid
Meridian, MS 39304

2019 Water System Improvements Contract II - Storage Improvements
Infrastructure
Results
MS

2019 Water System Imrovements Contract V - Rehabilitation of Existing Elevated Tank (4)
Infrastructure
Results
Jackson, MS 39204

Last Updated 04/28/2022 01:12 AM
Project Title

Elevated Water Storage Tank Improvements

Physical Address View project details and contacts
City, State (County) Sherman, MS   (Pontotoc County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents