Similar Projects
Upcoming RFP: Canal Maintenance Program CEQA and Permitting Support
Term Contract
Conception
San Jose, CA

Flood Protection - City of San Jose
Infrastructure
Conception
$7,986,000 est. value
San Jose, CA 95134

RFP Construction Manager - Upcoming Construction Management Services Coyote Creek Flood Management Measures and Flood Protection Projects
Infrastructure, Alteration
Design
San Jose, CA 95113

Foothills Park Improvement Project - PE-21000 - City of Palo Alto
New Construction, Renovation, Infrastructure
Design
$397,200 est. value
Los Altos, CA 94022

Exterior Envelope and Site Improvements at Huff Gardens Apartments
Infrastructure
Bidding
$525,000 est. value
San Jose, CA 95128

5 Year IDIQ for Earthquake Early Warning Site Infrastructure Installation
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Cupertino, CA 95014

Fisher Basin Expansion Project
Term Contract
Post-Bid
$1,450,000 est. value
Morgan Hill, CA 95037

Install steel piles, densify soil, construct approach slabs and RSP
Infrastructure
Post-Bid
CA

SCWP - Site Preparation Project
Infrastructure
Results
Sunnyvale, CA

Outfall Channel and Instrumentation Improvements
Infrastructure
Results
$4,180,435 est. value
San Jose, CA 95134

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Better Bikeways San Fernando (ATP) - City of San Jose
Infrastructure
Conception
$8,158,000 est. value
San Jose, CA 95154

Fire Station No.8 and Fire Station No.32 Phase 1 Site Demolition and Soil Mitigation and Grading Package
Demolition
Bidding
$1,516,000 est. value
San Jose, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Storm Water Pump Repair Services In San Mateo and Santa Clara Counties
Term Contract
Results

Last Updated 07/14/2022 03:29 PM
Project Title

Storm Water Retention Basin Remediation - 1837 - City of Santa Clara

Physical Address View project details and contacts
City, State (County) Santa Clara, CA   (Santa Clara County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $10,877 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project proposes to remove silt debris and other deposits from the Westside and Eastside Retention Basins and the Tasman Swale. The two basins and the Tasman Swale have collected significant sediment since its construction and needs to be dredged to restore its original line and grade and capacity to provide flood protection to the community. In 2018, the Westside Retention Basin was successfully desilted. The next phase is to complete the desilting work for the Eastside Retention Basin and the Tasman Swale. The project is necessary to prevent surface flooding onto public right-of-way and nearby businesses and residential homes. Project is included in the City of Santa Clara's FY 2022 - 2023 CIP. As of July 13, 2022, information regarding a design team or a general contractor is not available. A timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents